My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-248
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 10:21:38 AM
Creation date
10/1/2015 12:28:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/12/2008
Control Number
2008-248
Agenda Item Number
15.B.3
Entity Name
Geosyntec Inc.
Subject
Work Order No.15 fuel tank relocation
Area
DOT Facility to landfill
Supplemental fields
SmeadsoftID
7516
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Himanshu Mehta, P . E . Geosyntec <br /> 7 May 2008 <br /> consultants <br /> Page 12 <br /> No samples will be collected, nor will intrusive investigations will be performed as part of this <br /> Phase I ESA. However, Geosyntec will be prepared at the completion of this task to discuss <br /> Phase II ESA recommendations with you (as deemed necessary by IRC ) . <br /> Phase I ESA Task Ee Preparation of Phase I ESA Report <br /> Geosyntec' s Phase I ESA findings obtained through performance of the above tasks will be <br /> presented in a Phase I ESA Report. The report will provide details of the work performed by <br /> Geosyntec and the identified RECs, as well as "data gaps", and an opinion regarding "additional <br /> appropriate investigation" as required by ASTM E1527-05 . The report will generally follow the <br /> recommended table of contents provided in ASTM E 1527-05 , though, Geosyntec may deviate from <br /> this at its own discretion. The report will include a map of the site which indicates major site <br /> features Geosyntec identified in the Phase I ESA. The report will also include color copies of <br /> photographs taken by Geosyntec during its Task D Site Reconnaissance. One electronic (PDF <br /> copy) and up to five hard copies of each Phase VII ESA Report will be provided. <br /> The Phase I report discussed herein will be solely for the benefit of Geosyntec ' s client (in this <br /> case, IRC SWDD) . Geosyntec will issue the report to its client and grant it the right to rely on <br /> the report contents . If another entity requests the right to rely on the report, Geosyntec will <br /> consider the request and may grant a righMo-rely letter for an additional fee. Please note that <br /> Geosyntec ' s consent to provide a right-to-rely on a Phase I ESA report is subject to agreement to <br /> Geosyntec' s terms and conditions associated with Geosyntec ' s performance of this specific <br /> project . Also note that all such third party reliance is subject to Geosyntec ' s standard Secondary <br /> Client Agreement . <br /> Schedule — Phase I ESA <br /> Geosyntec can schedule to perform the site visit for each Phase I ESA within one week of receipt <br /> of execution of the Work Order. Geosyntec projects the Phase I ESA report can then be <br /> delivered to you within four additional weeks . This schedule and below-described budget <br /> estimate to complete this work is contingent upon the following : <br /> • Site access will not be restricted to Geosyntec and can be obtained by Geosyntec <br /> immediately upon receipt of your Work Authorization (we assume most of the site can be <br /> easily visited and viewed on foot and/or using a two wheel drive vehicle) ; <br /> XR08051 R/CCR08045 R. DOC <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.