My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-248
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 10:21:38 AM
Creation date
10/1/2015 12:28:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/12/2008
Control Number
2008-248
Agenda Item Number
15.B.3
Entity Name
Geosyntec Inc.
Subject
Work Order No.15 fuel tank relocation
Area
DOT Facility to landfill
Supplemental fields
SmeadsoftID
7516
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAO A <br /> HCC ENVIRONMENTAL SERVICES , INC . <br /> Groundwater Remediation Construction Services <br /> 340 S . W. Jasmine Avenue ( 352 ) 473-9801 <br /> Keystone Heights , FL 32656 Fax (352 ) 473-9841 <br /> April 6, 2008 <br /> GeoSyntec Consultants <br /> 6770 South Washington Avenue, Suite #3 <br /> Titusville, FL 32780 <br /> Facsimile : 321 -269-5813 <br /> ATTN : Mr. Jim Langenbach, P.E. <br /> RE : Proposal for AST relocation to the IRC Landfill <br /> Indian River County Landfill <br /> Vero Beach, Indian River County, Florida <br /> Work Order #15 <br /> HCC Bid #08=23 <br /> Dear Mr. Langenbach. <br /> HCC is pleased to provide you with a quotation bid to move the existing 12,000 AST from <br /> Gifford Road DOT yard to the IRC landfill, demolish and dispose of old tank slab, provide and <br /> install a new tank slab at the IRC landfill, provide and install new dispensers and card reader, <br /> hook up and make AST operational and remove the existing 8,000 AST at the landfill according <br /> to your plans, specifications and site visit as follows : <br /> 1 . Mobe to IRC Landfill, level ground, form and pour new slab for AST, <br /> let slab cure for 7 days minimum, including labor, material and permits. $ 9, 750 .00 <br /> (Based on previous experience I am assuming the new slab is 10 ' x 48 ' <br /> and consists of 4,000 psi concrete with fiber mesh 12" thick with a <br /> layer of No. 5 rebar, 12" on center each way. You can contact Phoenix <br /> Industries, the original tank manufacturer, for design loads. The tank also <br /> has feet which will result in point loads. No other curbing or site grading <br /> is included. You may want to include a 6' x 8 ' handi house/storage shed <br /> to house the card reader and supplies. Estimated cost $3 ,500.00 . 4" slab <br /> can be poured at the same time as the tank pad. <br /> 2 . Gifford Road AST tank removal and relocation to IRC landfill : <br /> Dismantle tank, remove & dispose of dispensers, disconnect electrical. <br />
The URL can be used to link to this page
Your browser does not support the video tag.