Laserfiche WebLink
AST to be prepared for lifting by crane and transported to the IRC <br /> Landfill and placed on new slab. The existing concrete pad will be <br /> demolished and disposed of at the IRC landfill. Existing concrete/steel <br /> bollards will be removed for reuse at new tank location. Some bollards <br /> may be destroyed and not able to be salvaged. The tank slab area will <br /> be backfilled and graded level to existing adjacent surfaces . <br /> Price for above $ 115520 . 00 <br /> (No tipping fees are included for concrete debris, tipping fees will be <br /> waived by IRC landfill . The AST is assumed to be empty, additional <br /> costs will be required if a VAC truck is necessary to empty and clean <br /> the contents . No costs are included for paving the area where the AST <br /> is removed.) <br /> 3 . The IRC landfill fueling area AST installation: <br /> Anchor tank to slab, hook up piping, set new dispensers & card reader, <br /> electrical hook up of dispensers, card reader and grounding. Set the <br /> bollards, start up services : <br /> Price for Labor, misc . piping & materials and electrical installation $ 12,950 . 00 <br /> Price for 2 dispensers, hoses, accessories, fuel management system <br /> and start up by manufacturer' s trained technician. (See attached) $ 1810450 .00 <br /> (Electrical service of sufficient power must be brought by others to <br /> within 10 feet of the tank. No paving, curbing, grading, etc. is included <br /> t are <br /> or the area around ere not salvageable 0geableAdditionale tank. crequired <br /> lshall be $ 00 each. We reommen tha <br /> that <br /> wa handi <br /> house be located near the center of the tank to house the card reader and <br /> other supplies .) <br /> 4 . AST closure of existing 8,000 tank at the IRC Landfill : <br /> Tank will be removed from the saddles by crane, cleaned with a VAC <br /> Truck, cut open to render useless and transported to a location at the <br /> Landfill as directed by others. <br /> Price for above $ 410625 . 00 <br /> (Bid assumes rinsate/liquids of 300 gallons at $ .75 per gallon. Additional <br /> gallons will be charged at the same rate . Sludges will be charged at the <br /> rate of $4 .00 per gallon. No costs are included for the removal, demolition <br />