AST to be prepared for lifting by crane and transported to the IRC <br />Landfill and placed on new slab. The existing concrete pad will be <br />demolished and disposed of at the IRC landfill. Existing concrete/steel <br />bollards will be removed for reuse at new tank location. Some bollards <br />may be destroyed and not able to be salvaged. The tank slab area will <br />be backfilled and graded level to existing adjacent surfaces. <br />Price for above $115520.00 <br />(No tipping fees are included for concrete debris, tipping fees will be <br />waived by IRC landfill. The AST is assumed to be empty, additional <br />costs will be required if a VAC truck is necessary to empty and clean <br />the contents. No costs are included for paving the area where the AST <br />is removed.) <br />3. The IRC landfill fueling area AST installation: <br />Anchor tank to slab, hook up piping, set new dispensers & card reader, <br />electrical hook up of dispensers, card reader and grounding. Set the <br />bollards, start up services: <br />Price for Labor, misc. piping & materials and electrical installation $12,950.00 <br />Price for 2 dispensers, hoses, accessories, fuel management system <br />and start up by manufacturer's trained technician. (See attached) $1810450.00 <br />(Electrical service of sufficient power must be brought by others to <br />within 10 feet of the tank. No paving, curbing, grading, etc. is included <br />t are <br />or the area around ere not salvageable 0geableAdditionale tank. crequired <br />lshall be $ 00 each. We reommen tha <br />that <br />wa handi <br />house be located near the center of the tank to house the card reader and <br />other supplies.) <br />4. AST closure of existing 8,000 tank at the IRC Landfill: <br />Tank will be removed from the saddles by crane, cleaned with a VAC <br />Truck, cut open to render useless and transported to a location at the <br />Landfill as directed by others. <br />Price for above $ 410625.00 <br />(Bid assumes rinsate/liquids of 300 gallons at $.75 per gallon. Additional <br />gallons will be charged at the same rate. Sludges will be charged at the <br />rate of $4.00 per gallon. No costs are included for the removal, demolition <br />