My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-248
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 10:21:38 AM
Creation date
10/1/2015 12:28:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/12/2008
Control Number
2008-248
Agenda Item Number
15.B.3
Entity Name
Geosyntec Inc.
Subject
Work Order No.15 fuel tank relocation
Area
DOT Facility to landfill
Supplemental fields
SmeadsoftID
7516
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AST to be prepared for lifting by crane and transported to the IRC <br /> Landfill and placed on new slab. The existing concrete pad will be <br /> demolished and disposed of at the IRC landfill. Existing concrete/steel <br /> bollards will be removed for reuse at new tank location. Some bollards <br /> may be destroyed and not able to be salvaged. The tank slab area will <br /> be backfilled and graded level to existing adjacent surfaces . <br /> Price for above $ 115520 . 00 <br /> (No tipping fees are included for concrete debris, tipping fees will be <br /> waived by IRC landfill . The AST is assumed to be empty, additional <br /> costs will be required if a VAC truck is necessary to empty and clean <br /> the contents . No costs are included for paving the area where the AST <br /> is removed.) <br /> 3 . The IRC landfill fueling area AST installation: <br /> Anchor tank to slab, hook up piping, set new dispensers & card reader, <br /> electrical hook up of dispensers, card reader and grounding. Set the <br /> bollards, start up services : <br /> Price for Labor, misc . piping & materials and electrical installation $ 12,950 . 00 <br /> Price for 2 dispensers, hoses, accessories, fuel management system <br /> and start up by manufacturer' s trained technician. (See attached) $ 1810450 .00 <br /> (Electrical service of sufficient power must be brought by others to <br /> within 10 feet of the tank. No paving, curbing, grading, etc. is included <br /> t are <br /> or the area around ere not salvageable 0geableAdditionale tank. crequired <br /> lshall be $ 00 each. We reommen tha <br /> that <br /> wa handi <br /> house be located near the center of the tank to house the card reader and <br /> other supplies .) <br /> 4 . AST closure of existing 8,000 tank at the IRC Landfill : <br /> Tank will be removed from the saddles by crane, cleaned with a VAC <br /> Truck, cut open to render useless and transported to a location at the <br /> Landfill as directed by others. <br /> Price for above $ 410625 . 00 <br /> (Bid assumes rinsate/liquids of 300 gallons at $ .75 per gallon. Additional <br /> gallons will be charged at the same rate . Sludges will be charged at the <br /> rate of $4 .00 per gallon. No costs are included for the removal, demolition <br />
The URL can be used to link to this page
Your browser does not support the video tag.