Laserfiche WebLink
Geosyntecc" <br />consultants <br />Himanshu Mehta, P.E. <br />Managing Director <br />Indian River County — Solid Waste Disposal District <br />1325 74th Avenue SW, <br />Vero Beach, FL 32968 <br />6770 South Washington Avenue, Suite 3 <br />Titusville, Florida 32780 <br />PH 321.269.5880 <br />FAX 321.269.5813 <br />www.geosyntec.com <br />7 May 2008 <br />Subject: Proposal for AST Closures, Sampling, Relocation, Fueling System Design and <br />Construction, Phase I ESA Due Diligence, and Completion of a NEPA Categorical <br />Exclusion Package, Work Order #15 <br />Vero Beach, Florida <br />Dear Mr. Mehta: <br />Geosyntec Consultants (Geosyntec) is pleased to submit this fee proposal to Indian River County <br />(IRC) Solid Waste Disposal District (SWDD) for professional services associated with the <br />closure and relocation of two aboveground storage tanks (ASTs), the design and construction of a <br />fueling area at the landfill, AST closure sampling and documentation, and the preparation of a <br />Phase I ESA and National Environmental Policy Act (NEPA) Categorical Exclusion Package for <br />an approximate 5 to 10 acre parcel west of the Gifford Convenience Center. This fee proposal <br />has been prepared in accordance with the negotiated contract between Geosyntec and IRC <br />SWDD. <br />PROJECT UNDERSTANDING <br />Geosyntec personnel and our subcontractors, PR&D, HCC Environmental Services, and FECC <br />met with IRC staff in 2007 and again in March 2008 to develop a project scope of work <br />associated with the petroleum -related work tasks. Based upon discussions with IRC staff the <br />project scope consists of: (i) the preparation of design drawings for the proposed AST relocation <br />area to be constructed at the landfill; (ii) the construction of the fueling area (grading and <br />concrete pad) and high-speed fuel dispensers (two) with card -reading system at the landfill; (iii) <br />the removal and relocation of the approximately 12,000 -gallon double -walled AST located on <br />IRC property along Gifford Road and placement on the constructed concrete pad at the landfill; <br />(iv) removal of the concrete pad and bumper posts and re -grading the site where the 12,000 - <br />gallon AST was removed; (v) closure of the existing approximately 8,000 -gallon steel AST <br />located at the landfill, including the performance of required soil borings, soil sampling, and the <br />installation and sampling of a temporary monitoring well; (vi) the preparation of an AST closure <br />Emil*III. IRACON:i 6101ASol AIM6 <br />engineers I scientists I innovators <br />