Laserfiche WebLink
Himanshu Mehta, P.E. <br />7 May 2008 <br />Page 3 <br />Geosyntec <br />consultants <br />upon the FID responses, one representative soil sample (location with highest FID response or <br />location immediately adjacent to dispenser) will be submitted to a fixed base analytical <br />laboratory. The collected soil sample will be analyzed for BTEX/MTBE by EPA Method 8260, <br />PAHs by EPA Method 8310, and TRPH by FL -PRO. In addition to the soil samples, Geosyntec <br />will provide oversight and sampling of a temporary monitoring well installed using a direct -push <br />technology (DPT) drill rig. Collect groundwater samples from the temporary monitoring well <br />will be laboratory analyzed for BTEX/MTBE by EPA Method 8260, PAHs by EPA Method <br />8310, total lead by EPA 6020 or equivalent, and TRPH by FL -PRO. <br />Geosyntec will provide oversight and coordination with our proposed subcontractor, HCC. The <br />AST will be unbolted from its concrete pad, rigged for loading, and loaded onto a transport <br />vehicle with a crane. The AST will then be transported to the IRC landfill and offloaded with a <br />crane. Upon removal of the AST, the existing concrete pad (dimensions of approximately 40 ft <br />by 10 ft by 12 -inches thick) will be broken up, bumper posts removed, and the debris will be <br />transported to the IRC landfill for disposal. The area where the concrete was removed will be <br />backfilled, as warranted, and re -graded to promote drainage. <br />Task Assumptions: <br />• No costs are included for the disposal of the concrete material or bumper posts at the IRC <br />landfill; it is assumed that any tipping fees associated with the concrete/debris disposal <br />will be handled internally by IRC SWDD. <br />• The double -walled AST meets the closure exemption requirements of Chapter 62- <br />761.800(4)(b), F.A.C. Collected soil and groundwater samples are being collected as a <br />component of due diligence activities associated with the parcel. <br />• The AST is assumed to be empty, additional budget may be required if a vacuum truck is <br />required to empty the AST contents. <br />• No costs are provided for any testing/certification of the integrity of the AST. <br />• No costs are included for paving the area where the AST is removed. <br />Task 3 — IRC Landfill Fueling Area Construction and AST Installation <br />Task 3 includes costs associated with the construction of the fueling area by PR&D, Geosyntec <br />inspections, the placement of the AST, and the installation of a high-speed fuel dispenser (two <br />dispensers) with a card reader system, card encoder, modem and provision of 100 cards to IRC <br />SWDD. Prior to construction activities, HCC will obtain construction permits from IRC. For <br />XR08051 R/CCR08045 R. DOC <br />engineers I scientists I innovators <br />