Laserfiche WebLink
Himanshu Mehta, P . E . Geosyntec <br /> 7 May 2008 consultants <br /> Page 3 <br /> upon the FID responses, one representative soil sample (location with highest FID response or <br /> location immediately adjacent to dispenser) will be submitted to a fixed base analytical <br /> laboratory. The collected soil sample will be analyzed for BTEX/MTBE by EPA Method 8260, <br /> PAHs by EPA Method 8310, and TRPH by FL-PRO . In addition to the soil samples, Geosyntec <br /> will provide oversight and sampling of a temporary monitoring well installed using a direct-push <br /> technology (DPT) drill rig. Collect groundwater samples from the temporary monitoring well <br /> will be laboratory analyzed for BTEX/MTBE by EPA Method 8260 , PAHs by EPA Method <br /> 8310, total lead by EPA 6020 or equivalent, and TRPH by FL-PRO . <br /> Geosyntec will provide oversight and coordination with our proposed subcontractor, HCC . The <br /> AST will be unbolted from its concrete pad, rigged for loading, and loaded onto a transport <br /> vehicle with a crane. The AST will then be transported to the IRC landfill and offloaded with a <br /> crane. Upon removal of the AST, the existing concrete pad (dimensions of approximately 40 ft <br /> by 10 ft by 12 -inches thick) will be broken up , bumper posts removed, and the debris will be <br /> transported to the IRC landfill for disposal . The area where the concrete was removed will be <br /> backfilled, as warranted, and re-graded to promote drainage . <br /> Task Assumptions : <br /> • No costs are included for the disposal of the concrete material or bumper posts at the IRC <br /> landfill ; it is assumed that any tipping fees associated with the concrete/debris disposal <br /> will be handled internally by IRC SWDD . <br /> • The double-walled AST meets the closure exemption requirements of Chapter 62 - <br /> 761 . 800(4)(b) , F . A . C . Collected soil and groundwater samples are being collected as a <br /> component of due diligence activities associated with the parcel . <br /> • The AST is assumed to be empty, additional budget may be required if a vacuum truck is <br /> required to empty the AST contents . <br /> • No costs are provided for any testing/certification of the integrity of the AST . <br /> • No costs are included for paving the area where the AST is removed . <br /> Task 3 — IRC Landfill Fueling Area Construction and AST Installation <br /> Task 3 includes costs associated with the construction of the fueling area by PR&D , Geosyntec <br /> inspections, the placement of the AST , and the installation of a high- speed fuel dispenser (two <br /> dispensers) with a card reader system, card encoder, modem and provision of 100 cards to IRC <br /> SWDD . Prior to construction activities, HCC will obtain construction permits from IRC . For <br /> XR08051 R/CCR08045 R. DOC <br /> engineers I scientists I innovators <br />