My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-110
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:23:22 PM
Creation date
9/30/2015 6:30:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
05/06/2003
Control Number
2003-110
Agenda Item Number
14.B.3.
Entity Name
GeoSyntec Consultants
Subject
Proposal to install upgradient wells
Area
South Gifford Rd Landfill
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3235
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GaoSyNpmc CoNSmrmm <br /> Mr. Michael L. Frey <br /> 9 April 2003 <br /> Page 7 <br /> • an evaluation of the adequacy of the water quality monitoring frequency and <br /> sampling locations based upon site conditions ; and <br /> • recommendations regarding cessation of sampling or reduction in sampling (wells <br /> or parameters) recommended for each site, based oil site-specific data. <br /> The biennial technical reports will be submitted to Indian River County for review <br /> prior to submittal to the FDEP . The Final reports for cacti of the four sites will he siumcd <br /> and sealed by the designated professional engineer and/or geologist in responsible charoc <br /> of the project. <br /> SCHEDULE <br /> GeoSyntee will initiate contracts with drillers , laboratories, and surveyors upon <br /> execution of the attached work authorization by Indian River County. Depending on <br /> subcontractor availability, GeoSyntec will mobilize to the field within one to two weeks of <br /> work authorization execution . <br /> BUDGET ESTIMATE <br /> GeoSyntec estimates that the services outlined in this scope of work can be <br /> accomplished for the estimated costs summarized below. A detailed cost estimate is <br /> provided as Attacbment A. Please mote that for Task 1 , subcontractor costs, including <br /> drilling, surveying, and other subcontractor services , are approximately 45 % of the total <br /> task cost . <br /> Task 1 : Upgradient Off-Site Plume Monitoring $81 ,700 <br /> Task 2 : Blencial Reporting—Four Closed Landfill Sites $28 , 500 <br /> �LTOTAL PROJECT COST ESTIMATE $ 110,200 <br /> XR030351R030082 .DOC <br /> IP1r1Z110 N1Y 11f4lCW4t �/ <br /> TOTAL P . 02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.