Laserfiche WebLink
GEOSYNTEC CONSULTANTS <br /> Mr. Michael L. Frey <br /> 9 April 2003 <br /> Page 6 <br /> The budget estimate for this fieldwork task assumes one person in the field for one 12- <br /> hour day to complete the soil sampling. <br /> Task 1.5. Reporting <br /> The results of the expanded off-site assessment will be summarized in a letter report <br /> that will include well construction details , applicable field notes and observations, <br /> lithologic logs, groundwater sampling logs, maps, and analytical results . The analytical <br /> results will also be used in preparing the RAP . <br /> Preparation of Biennial Reports <br /> Task 2. Biennial Reporting — Closed Landfill Sites <br /> GeoSyntec will prepare Monitoring Plan Implementation Schedule (MPIS) biennial <br /> technical reports for the Wabasso , Oslo, South Winter Beach, and Roseland Landfills (total <br /> of four individual reports) . The technical reports will summarize and interpret the water <br /> quality data and water level measurements collected by Indian River County and/or Test <br /> America Laboratory for the past four sampling events . The technical reports for each of <br /> the four sites will contain, at a minimum, the following : <br /> • tabular and graphical displays of any data which shows that a monitoring parameter <br /> has been detected, including hydrographs for all monitoring wells ; <br /> • trend analyses of any monitoring parameters detected; <br /> • comparisons among shallow, middle, and deep zone wells ; <br /> • comparison between upgradient and downgradient wells ; <br /> • correlation between related field parameters such as total dissolved solids and <br /> specific conductance; <br /> • discussion of erratic and/or poorly correlated data; <br /> • an interpretation of the groundwater contour maps , including an evaluation of <br /> groundwater flow rates ; <br /> XR03035/R030082 .DOC <br /> G. <br /> RECYCLED AND RECYCLABLE � r <br />