My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-060
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:56:00 PM
Creation date
9/30/2015 10:35:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/13/2007
Control Number
2007-060
Agenda Item Number
9.B.2
Entity Name
Passage Island Homes
Subject
Gifford Park Security House
Area
Gifford Park
Project Number
0503
Bid Number
2007033
Supplemental fields
SmeadsoftID
6132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E . Resubmittals will be handled in the same manner as first submittals. On resubmittals the <br /> CONTRACTOR shall direct specific attention, in writing on the letter of transmittal and on <br /> resubmitted shop drawings by use of revision triangles or other similar methods, to revisions <br /> other than the corrections requested by the ENGINEER, on previous submissions . Any such <br /> revisions that are not clearly identified shall be made at the risk of the CONTRACTOR. The <br /> CONTRACTOR shall make corrections to any work done because of this type revision that is <br /> not in accordance to the Contract Documents as may be required by the ENGINEER. <br /> F. Partial submittals may not be reviewed. The ENGINEER will be the only judge as to the <br /> completeness of a submittal. Submittals not complete will be returned to the CONTRACTOR, <br /> and will be considered "Not Approved" until resubmitted. The ENGINEER may at his/her <br /> option provide a list or mark the submittal directing the CONTRACTOR to the areas that are <br /> incomplete. <br /> G. Repetitive Review <br /> 1 . Shop drawings and other submittals will be reviewed no more than twice at the <br /> OWNER's expense. All subsequent reviews will be performed at times <br /> convenient to the ENGINEER and at the CONTRACTOR's expense, based on the <br /> ENGINEER's then prevailing rates. The CONTRACTOR shall reimburse the <br /> OWNER for all such fees invoiced to the OWNER by the ENGINEER. <br /> Submittals are required until approved. <br /> 2 . Any need for more than one resubmission, or any other delay in obtaining <br /> ENGINEER's review of submittals, will not entitle CONTRACTOR to extension <br /> of the Contract Time. <br /> H. If the CONTRACTOR considers any correction indicated on the shop drawings to <br /> constitute a change to the Contract Documents, the CONTRACTOR shall give written notice <br /> thereof to the ENGINEER at least seven working days prior to release for manufacture. <br /> I. When the shop drawings have been completed to the satisfaction of the ENGINEER, the <br /> CONTRACTOR shall cavy out the construction in accordance therewith and shall make no <br /> farther changes therein except upon written instructions from the ENGINEER. <br /> r <br /> 1 .06 DISTRIBUTION <br /> A. Distribute reproductions of approved shop drawings and copies of approved product data <br /> and samples, where required, to the job site file and elsewhere as directed by the ENGINEER. <br /> Number of copies shall be as required by the ENGINEER but shall not exceed 6. <br /> s <br /> 1 .07 CONSTRUCTION PHOTOGRAPHS <br /> A. The CONTRACTOR shall make photos of the work in progress at key intervals and <br /> where directed by the Owner. <br /> B. The film negatives shall be retained in the files of the CONTRACTOR until the <br /> completion of the project and shall then be turned over to the OWNER. <br /> C. Photographs may be made with digital files and kept on CD ' s for turning over to the <br /> owner. <br /> Page 20 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.