B . The CONTRACTOR remains responsible for details and accuracy, for coordinating the <br /> work with all other associated work and trades, for selecting fabrication processes, for <br /> techniques of assembly, and for performing work in a safe manner. <br /> C . If the shop drawings, data or samples as submitted describe variations and show a <br /> departure from the Contract requirements which ENGINEER finds to be in the interest of <br /> the OWNER and to be so minor as not to involve a change in Contract Price or time for <br /> performance, the ENGINEER may return the reviewed drawings without noting an <br /> exception. <br /> D. Submittals will be returned to the CONTRACTOR under one of the following codes. <br /> Code 1 -"APPROVED" is assigned when there are no notations or comments on the <br /> submittal. When returned under this code the CONTRACTOR may release the <br /> _ equipment and/or material for manufacture. <br /> Code 2 -"APPROVED AS NOTED" is assigned when notations or comments have been <br /> made on the submittal pointing out minor discrepancies as compared with the <br /> Contract Documents . Resubmittal or confirmation is not necessary prior to <br /> release for manufacturing. <br /> Code 3 -"APPROVED AS NOTED/CONFIRM" . This combination of codes is assigned <br /> when a confirmation of the notations and comments is required by the <br /> CONTRACTOR. The CONTRACTOR may release the equipment or material <br /> .. for manufacture; however, all notations and comments must be incorporated into <br /> the final product. This confirmation is to address the omissions and/or <br /> nonconforming items that were noted. Only the items to be "confirmed" need to <br /> be resubmitted. <br /> Code 4 -"APPROVED AS NOTED/RESUBMIT " . This combination of codes is <br /> assigned when notations and comments are extensive enough to require a <br /> resubmittal of the package. The Contractor may release the equipment or material <br /> for manufacture; however, all notations and comments must be incorporated into <br /> ,. the final product. This resubmittal is to address all comments, omissions and non- <br /> conforming items that were noted. Resubmittal is to be received by the <br /> ENGINEER within 20 calendar days of the date of the ENGIlVEER's transmittal <br />.. requiring the resubmittal. <br /> Code 5 -"NOT APPROVED" is assigned when the submittal does not meet the intent of <br /> the Contract Documents. The CONTRACTOR must resubmit the entire package <br /> revised to bring the submittal into conformance. It may be necessary to resubmit <br /> using a different manufacturer/vendor to meet the Contract Documents. <br /> Code 6 -"COMMENTS ATTACHED" is assigned where there are comments attached to <br /> the returned submittal, which provide additional data to aid the CONTRACTOR. <br /> Code 7 —"FOR YOUR INFORMATION" is assigned when the package provides <br /> information of a general nature that may or may not require a response. <br /> Codes 1 through 5 designate the status of the reviewed submittal with Code 6 showing there has <br /> been an attachment of additional data. <br /> Code 7 is used as may be necessary. <br /> Page 19 of 40 <br />