Laserfiche WebLink
construction accomplished which does not conform to approved shop drawings and data <br /> shall be at the CONTRACTOR's risk. The OWNER will not be liable for any expense or <br /> + delay due to corrections or remedies required to accomplish conformity. <br /> F. Project work, materials, fabrication, and installation shall conform to approved shop <br /> drawings, applicable samples, and product data. <br /> 1 .04 SUBMISSION REQUIREMENTS <br /> a. <br /> A. Make submittals promptly in accordance with approved schedule, and in such sequence <br /> + <br /> as to cause no delay in the Work or in the work of any other contractor. <br /> B . Each submittal will be returned within 15 working days following receipt of submittal by <br /> + <br /> the ENGINEER. <br /> C . Number of submittals required: <br /> 1 . Shop Drawings as defined in Paragraph 1 . 02 A: Six (6) copies. <br /> 2. Product Data as defined in Paragraph 1 . 02 B : Six (6) copies . <br /> + <br /> 3 . Samples: Submit the number stated in the respective Specification Sections . <br /> D. Submittals shall contain: <br /> 1 . The date of submission and the dates of any previous submissions. <br /> 2 . The Project title and number. <br /> 3 . CONTRACTOR identification. <br /> 4. The names of: <br /> a. CONTRACTOR <br /> b. Supplier <br /> C. MANUFACTURER <br /> 5 . Identification of the product, with the specification section number, page and <br /> + paragraph(s) . <br /> 6. Field dimensions, clearly identified as such. <br /> 7 . Relation to adjacent or critical features of the Work or materials. <br /> 8 . Applicable standards, such as ASTM or Federal Specification numbers. <br /> 9. Identification of deviations from Contract Documents . <br /> 10. Identification of revisions on resubmittals. <br /> .� 11 . An 8-in x 3 -in blank space for CONTRACTOR and ENGINEER stamps. <br /> 1 .05 REVIEW OF SHOP DRAWINGS, PRODUCT DATA, WORKING DRAWINGS AND <br /> .. SAMPLES <br /> A. The review of shop drawings, data, and samples will be for general conformance with the <br /> + design concept and Contract Documents. They shall not be construed: <br /> 1 . as permitting any departure from the Contract requirements; <br /> + 2 . as relieving the CONTRACTOR of responsibility for any errors, including details, <br /> dimensions, and materials; <br /> 3 . as approving departures from details furnished by the ENGINEER, except as <br /> otherwise provided herein. <br /> Page 18 of 40 <br />