My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-060
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:56:00 PM
Creation date
9/30/2015 10:35:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/13/2007
Control Number
2007-060
Agenda Item Number
9.B.2
Entity Name
Passage Island Homes
Subject
Gifford Park Security House
Area
Gifford Park
Project Number
0503
Bid Number
2007033
Supplemental fields
SmeadsoftID
6132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction accomplished which does not conform to approved shop drawings and data <br /> shall be at the CONTRACTOR's risk. The OWNER will not be liable for any expense or <br /> + delay due to corrections or remedies required to accomplish conformity. <br /> F. Project work, materials, fabrication, and installation shall conform to approved shop <br /> drawings, applicable samples, and product data. <br /> 1 .04 SUBMISSION REQUIREMENTS <br /> a. <br /> A. Make submittals promptly in accordance with approved schedule, and in such sequence <br /> + <br /> as to cause no delay in the Work or in the work of any other contractor. <br /> B . Each submittal will be returned within 15 working days following receipt of submittal by <br /> + <br /> the ENGINEER. <br /> C . Number of submittals required: <br /> 1 . Shop Drawings as defined in Paragraph 1 . 02 A: Six (6) copies. <br /> 2. Product Data as defined in Paragraph 1 . 02 B : Six (6) copies . <br /> + <br /> 3 . Samples: Submit the number stated in the respective Specification Sections . <br /> D. Submittals shall contain: <br /> 1 . The date of submission and the dates of any previous submissions. <br /> 2 . The Project title and number. <br /> 3 . CONTRACTOR identification. <br /> 4. The names of: <br /> a. CONTRACTOR <br /> b. Supplier <br /> C. MANUFACTURER <br /> 5 . Identification of the product, with the specification section number, page and <br /> + paragraph(s) . <br /> 6. Field dimensions, clearly identified as such. <br /> 7 . Relation to adjacent or critical features of the Work or materials. <br /> 8 . Applicable standards, such as ASTM or Federal Specification numbers. <br /> 9. Identification of deviations from Contract Documents . <br /> 10. Identification of revisions on resubmittals. <br /> .� 11 . An 8-in x 3 -in blank space for CONTRACTOR and ENGINEER stamps. <br /> 1 .05 REVIEW OF SHOP DRAWINGS, PRODUCT DATA, WORKING DRAWINGS AND <br /> .. SAMPLES <br /> A. The review of shop drawings, data, and samples will be for general conformance with the <br /> + design concept and Contract Documents. They shall not be construed: <br /> 1 . as permitting any departure from the Contract requirements; <br /> + 2 . as relieving the CONTRACTOR of responsibility for any errors, including details, <br /> dimensions, and materials; <br /> 3 . as approving departures from details furnished by the ENGINEER, except as <br /> otherwise provided herein. <br /> Page 18 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.