My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-060
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:56:00 PM
Creation date
9/30/2015 10:35:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/13/2007
Control Number
2007-060
Agenda Item Number
9.B.2
Entity Name
Passage Island Homes
Subject
Gifford Park Security House
Area
Gifford Park
Project Number
0503
Bid Number
2007033
Supplemental fields
SmeadsoftID
6132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> manufacturer's printed statements of compliances and applicability, roughing-in diagrams <br /> and templates, catalog cuts, product photographs, standard wiring diagrams, printed <br /> performance curves and operational-range diagrams, production or quality control <br /> inspection and test reports and certifications, mill reports, product operating and <br /> maintenance instructions and recommended spare-parts listing and printed product <br /> warranties, as applicable to the Work. <br /> C . Samples <br /> i <br /> 1 . Samples include, but are not necessarily limited to, physical examples of the work <br /> such as sections of manufactured or fabricated work, small cuts or containers of <br /> i materials, complete units of repetitively-used products, color/texture/pattern swatches and <br /> range sets, specimens for coordination of visual effect, graphic symbols and units of work <br /> to be used by the ENGINEER or OWNER for independent inspection and testing, as <br /> i applicable to the Work. <br /> 1 .03 CONTRACTOR' S RESPONSIBILITIES <br /> r <br /> A. The CONTRACTOR shall review shop drawings, product data and samples, including <br /> those by subcontractors, prior to submission to determine and verify the following: <br /> i <br /> 1 . Field measurements <br /> r <br /> 2. Field construction criteria <br /> 3 . Catalog numbers and similar data <br /> 4. Conformance with the Specifications <br /> r <br /> B . Each shop drawing, sample and product data submitted by the CONTRACTOR shall <br /> have affixed to it the following Certification Statement including the CONTRACTOR's <br /> r Company name and signed by the CONTRACTOR: "Certification Statement: by this <br /> submittal, I hereby represent that I have determined and verified all field measurements, <br /> field construction criteria, materials, dimensions, catalog numbers and similar data and I <br /> have checked and coordinated each item with other applicable approved shop drawings <br /> and all Contract requirements. " Shop drawings and product data sheets 11 -in x 17-in and <br /> smaller shall be bound together in an orderly fashion and bear the above Certification <br /> .. Statement on the cover sheet. The cover sheet shall fully describe the packaged data and <br /> include a listing of all items within the package. Provide to the Resident Project <br /> Representative a copy of each submittal transmittal sheet for shop drawings, product data <br /> i and samples at the time of submittal of said drawings, product data and samples to the <br /> ENGINEER. <br /> .. C . Notify the ENGINEER in writing, at the time of submittal, of any deviations in the <br /> submittals from the requirements of the Contract Documents. <br /> i D. The review and approval of shop drawings, samples or product data by the ENGINEER <br /> shall not relieve the CONTRACTOR from his/her responsibility with regard to the <br /> fulfillment of the terms of the Contract. All risks of error and omission are assumed by <br /> i the CONTRACTOR and the ENGINEER will have no responsibility therefore. <br /> E . No portion of the work requiring a shop drawing, sample, or product data shall be started <br /> i nor shall any materials be fabricated or installed prior to the approval or qualified <br /> approval of such item. Fabrication performed, materials purchased or on-site <br /> Page 17 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.