Laserfiche WebLink
TECHNICAL SPECIFICATIONS <br /> - <br /> 1 .01 GENERAL <br /> a. Visit to and inspection of the construction site will be made from time to time <br /> by representatives of permitting agencies, the Owner, or Engineer. The work <br /> will not be accepted by the owner until final acceptance is received by all <br /> jurisdictional agencies. <br /> b . No work shall be performed outside the limits of the designated work site <br /> without authorization by the Owner. <br /> — <br /> 1 .02 FIELD ENGINEERING AND LAYOUT <br /> — <br /> A. The contractor shall furnish all construction staking. Staking shall be supervised by a Florida <br /> Registered Land Surveyor. <br /> - B . Appropriate equipment shall be kept at the site at all times . <br /> C . All costs for staking the work shall be included in the appropriate bid items. <br /> D . The Contractor shall preserve all staking, benchmarks, reference points, etc . <br /> - <br /> 1 .03 TESTING <br /> A. The Owner will pay for services of independent testing laboratories. <br /> 1 .04 SUBMITTALS (SAMPLES) <br /> A. Contractor shall be required to submit for approval a construction progress schedule . No work <br /> shall proceed or Notice to Proceed issued until that schedule is approved. <br /> B . Security House submittals: Submittals shall be provided by the Contractor but are not limited to <br /> the following items however these items shall be reviewed relative to the allowances in the bid <br /> schedule by the Owner and adjustments made, if any. Submittals shall include <br /> .� manufacturer/vendor/supplier/subcontractor quotes . Allowances or alternate deducts shall <br /> include installation. No mark-up ' s will be paid for these items : <br /> 1 . Flooring: carpet and ceramic tile <br /> .. 2 . Fixtures: fans and lighting (interior and exterior) <br /> 3 . Cabinets with hardware and fixtures: baths and kitchen <br /> 4. Appliances: kitchen and laundry <br /> 5 . Openings including hardware/lockets : windows and doors <br /> Other submittals shall include those items to be paid by the other bid items, together with <br /> installation, e.g. roofing, A/C equipment, electrical materials, painting/glazing materials. <br /> C . Utility Submittals : Contractor shall submit as specified elsewhere herein all utility materials to <br /> be used for construction of the water and sewer facilities . <br /> D . Where required for evaluation and approval of submittals, the Contractor will include samples to <br /> illustrate the materials, equipment or workmanship. <br /> r <br />,. Page 24 of 40 <br />