My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-060
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:56:00 PM
Creation date
9/30/2015 10:35:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/13/2007
Control Number
2007-060
Agenda Item Number
9.B.2
Entity Name
Passage Island Homes
Subject
Gifford Park Security House
Area
Gifford Park
Project Number
0503
Bid Number
2007033
Supplemental fields
SmeadsoftID
6132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS <br /> - <br /> 1 .01 GENERAL <br /> a. Visit to and inspection of the construction site will be made from time to time <br /> by representatives of permitting agencies, the Owner, or Engineer. The work <br /> will not be accepted by the owner until final acceptance is received by all <br /> jurisdictional agencies. <br /> b . No work shall be performed outside the limits of the designated work site <br /> without authorization by the Owner. <br /> — <br /> 1 .02 FIELD ENGINEERING AND LAYOUT <br /> — <br /> A. The contractor shall furnish all construction staking. Staking shall be supervised by a Florida <br /> Registered Land Surveyor. <br /> - B . Appropriate equipment shall be kept at the site at all times . <br /> C . All costs for staking the work shall be included in the appropriate bid items. <br /> D . The Contractor shall preserve all staking, benchmarks, reference points, etc . <br /> - <br /> 1 .03 TESTING <br /> A. The Owner will pay for services of independent testing laboratories. <br /> 1 .04 SUBMITTALS (SAMPLES) <br /> A. Contractor shall be required to submit for approval a construction progress schedule . No work <br /> shall proceed or Notice to Proceed issued until that schedule is approved. <br /> B . Security House submittals: Submittals shall be provided by the Contractor but are not limited to <br /> the following items however these items shall be reviewed relative to the allowances in the bid <br /> schedule by the Owner and adjustments made, if any. Submittals shall include <br /> .� manufacturer/vendor/supplier/subcontractor quotes . Allowances or alternate deducts shall <br /> include installation. No mark-up ' s will be paid for these items : <br /> 1 . Flooring: carpet and ceramic tile <br /> .. 2 . Fixtures: fans and lighting (interior and exterior) <br /> 3 . Cabinets with hardware and fixtures: baths and kitchen <br /> 4. Appliances: kitchen and laundry <br /> 5 . Openings including hardware/lockets : windows and doors <br /> Other submittals shall include those items to be paid by the other bid items, together with <br /> installation, e.g. roofing, A/C equipment, electrical materials, painting/glazing materials. <br /> C . Utility Submittals : Contractor shall submit as specified elsewhere herein all utility materials to <br /> be used for construction of the water and sewer facilities . <br /> D . Where required for evaluation and approval of submittals, the Contractor will include samples to <br /> illustrate the materials, equipment or workmanship. <br /> r <br />,. Page 24 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.