Laserfiche WebLink
r <br /> 1 .05 TEMPORARY UTILITIES AND SERVICES : <br /> A. The Contractor is responsible for providing any temporary water service, sanitary facilities or <br /> electrical service to satisfactorily complete the work specified herein. Contractor is responsible <br /> for providing job site security until final acceptance by the Owner. Contractor is responsible for <br /> removing the temporary facilities when the work is accepted by the Owner. <br /> " 1 .06 RESTORATION <br /> A. The Contractor is responsible and shall repair all damage to the site and pavement, buildings, <br /> utilities, or other offsite structures, surface or subsurface, whether or not shown on the <br /> Drawings. <br /> 1 .07 SITE CLEANUP <br /> A. The Contractor shall furnish all labor, equipment and materials necessary to cleanup and restore <br /> the site and offsite areas as directed by the owner after the Construction is completed. The <br /> security house shall be thoroughly cleaned inside and out. <br /> 1 .08 COORDINATION OF WORK <br /> A. The contractor is responsible for coordinating his work with ongoing and scheduled Gifford Park <br /> r and Youth Center activities Center including but not limited to protection of the park patrons and <br /> maintenance of traffic. <br /> 1 .09 EROSION CONTROL AND DEWATERING : <br /> r A. The Contractor is solely responsible for preventing pollution caused by dewatering water or <br /> stormwater runoff from the site. Contractor is referred to Chapter 4, "Best Management <br /> Practices of Erosion and Sedimentation Control" of the Florida Erosion and Sediment Control <br /> r Inspector' s Manual. A copy of the manual is available for review in the office of the Director of <br /> Public Works location at Indian River County Administration Building, Room S316, 1840 25s' <br /> Street, Vero Beach, Florida. <br /> r <br /> 1 .10 CLEARING AND GRUBBING, EARTHWORK <br /> A. The Contractor shall clear and grub the entire site limits, as shown on the drawings, of any <br /> debris, materials, structures, shrubs, roots, vegetation and suitably dispose of all such materials, <br /> at a site as approved by the Owner or Engineer. <br /> r B. Contractor shall perform all earthwork necessary for excavation, backfill with suitable material, <br /> building compacted fill and trench backfill and compaction. Building fill material shall be <br /> compacted to 100% of maximum dry density per ASTM T- 180 test standards . <br /> C. Additional specifications are shown on the drawings. <br /> r <br /> r Page 25 of 40 <br />