My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-060
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:56:00 PM
Creation date
9/30/2015 10:35:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/13/2007
Control Number
2007-060
Agenda Item Number
9.B.2
Entity Name
Passage Island Homes
Subject
Gifford Park Security House
Area
Gifford Park
Project Number
0503
Bid Number
2007033
Supplemental fields
SmeadsoftID
6132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 .05 TEMPORARY UTILITIES AND SERVICES : <br /> A. The Contractor is responsible for providing any temporary water service, sanitary facilities or <br /> electrical service to satisfactorily complete the work specified herein. Contractor is responsible <br /> for providing job site security until final acceptance by the Owner. Contractor is responsible for <br /> removing the temporary facilities when the work is accepted by the Owner. <br /> " 1 .06 RESTORATION <br /> A. The Contractor is responsible and shall repair all damage to the site and pavement, buildings, <br /> utilities, or other offsite structures, surface or subsurface, whether or not shown on the <br /> Drawings. <br /> 1 .07 SITE CLEANUP <br /> A. The Contractor shall furnish all labor, equipment and materials necessary to cleanup and restore <br /> the site and offsite areas as directed by the owner after the Construction is completed. The <br /> security house shall be thoroughly cleaned inside and out. <br /> 1 .08 COORDINATION OF WORK <br /> A. The contractor is responsible for coordinating his work with ongoing and scheduled Gifford Park <br /> r and Youth Center activities Center including but not limited to protection of the park patrons and <br /> maintenance of traffic. <br /> 1 .09 EROSION CONTROL AND DEWATERING : <br /> r A. The Contractor is solely responsible for preventing pollution caused by dewatering water or <br /> stormwater runoff from the site. Contractor is referred to Chapter 4, "Best Management <br /> Practices of Erosion and Sedimentation Control" of the Florida Erosion and Sediment Control <br /> r Inspector' s Manual. A copy of the manual is available for review in the office of the Director of <br /> Public Works location at Indian River County Administration Building, Room S316, 1840 25s' <br /> Street, Vero Beach, Florida. <br /> r <br /> 1 .10 CLEARING AND GRUBBING, EARTHWORK <br /> A. The Contractor shall clear and grub the entire site limits, as shown on the drawings, of any <br /> debris, materials, structures, shrubs, roots, vegetation and suitably dispose of all such materials, <br /> at a site as approved by the Owner or Engineer. <br /> r B. Contractor shall perform all earthwork necessary for excavation, backfill with suitable material, <br /> building compacted fill and trench backfill and compaction. Building fill material shall be <br /> compacted to 100% of maximum dry density per ASTM T- 180 test standards . <br /> C. Additional specifications are shown on the drawings. <br /> r <br /> r Page 25 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.