Laserfiche WebLink
M <br />D. All Record Drawings are subject to review and approval by County <br />Surveyor. <br />,. E. Payment for Record Drawings, Review of Electronic As-Builts and signing <br />and sealing As-Builts shall be made under: <br />W Pay Item No. 108-1 — Record Drawings — Lump Sum <br />+. 1_4 ACCURACY <br />The CONTRACTOR will be held responsible for the accuracy and completeness of <br />r Record Drawings and Electronic As-Builts and shall bear any costs incurred in <br />finding utilities as a result of incorrect data furnished by the CONTRACTOR. <br />1.5 SUBMITTAL <br />Upon Substantial Completion of the Work, deliver Record Drawings to ENGINEER. <br />Final payment will not be made until satisfactory record documents are received by <br />ENGINEER. <br />W <br />+ + END OF SECTION + + <br />W <br />r <br />• <br />so <br />M <br />M 01720-3 01720 Record Documents <br />F:1Engineering%Capital <br />Projects19611-CR <br />512 Widening19611 <br />CR 512 PHASE RAContract Documents10001-01720 - Record <br />Documents.doc <br />40 <br />t. <br />