Laserfiche WebLink
3 : Sheet 7 of 74, Typical Section, of the CR 512 Phase IV Roadway Improvement construction <br /> • drawings for the 4" sidewalk detail, * 6" thick at Driveways (no extra charge) is hereby clarified as <br /> follows : The Contractor shall thicken the proposed concrete sidewalk from 4" to 6" throughout all <br /> driveway sections. The cost is to be included in the over all cost of the sidewalk per square yard. <br /> 4. SECTION 00310 — Bid Form, page 00310-4, Item 327-73 , Milling Existing Asphalt Paving of the <br /> ITEMIZED BID SCHEDULE description shall be amended to read (Milling Existing Asphalt <br /> • Paving -1" Depth) <br /> Milling and resurfacing thickness is called out to be 1 " minimum in the Summary of Pay Items. <br /> • Notes have been added to the plan sheets to call out the required thickness. This pay item quantity <br /> includes milling and resurfacing at the west end of the project (Sta 34+00 to Sta 40+00) . Sheets 9 <br /> • & 10 of the CR 512 Phase IV Roadway Improvement construction drawings have been revised to <br /> call out the thickness and limits of milling and resurfacing. <br /> • 5 . The Maintenance of Traffic between Station 34+30 and Station 40+00 shall be done per the FDOT <br /> Design Standards for Design, Construction, Maintenance and Utility Operations on the State <br /> Highway System, 2006, Index 600 through 670. <br /> • 6 . All suitable material excavated from the ponds shall be utilized for the roadway embankment. The <br /> Contractor shall take measures to assure proper moisture content for compaction. All un-suitable <br /> ,. material shall be disposed of in a proper manner at the Contractors expense . <br /> 7 . Soil fines according to the plans require no more than 8% fines passing the 200 sieve. The <br /> .. specifications require no more than 12% . The 12% fines passing the 200 sieve shall govern. <br /> 8 . Road work between stations 34+30 to 40+00 shall be widening only. Not reconstructed. <br /> • 9 . An additional sewer force main stub-out on the northwest comer of 1015` Avenue and CR 512 has <br /> been added to Sheet U4 and the summary of pay items. IRCUD will handle all permitting related to <br /> M the addition of this stub-out. <br /> SECTION 00310 — Bid Form, page 00310-7, ITEMIZED BID SCHEDULE - <br /> • Item Description Quantity unit unit price Amount <br /> 1543- 111 -008 10"x 6" wet tap W/ valve box 3 EA <br /> #' Shall be amended to read: <br /> (NEVA 1513- 160-216 Sanitary sewer force main (6"PVCI 70 LF <br /> • 1543- 111 -008 10"x6" wet tan W/ valve box 4 EA <br /> 10. Pay Item 102-3 , Commercial Material — are units CY. <br /> Commercial material is defined as material typically used for base, including recycled asphalt that <br /> will provide a firm surface under wet conditions . Commercial material will be used primarily in the <br /> temporary transitions between the existing and constructed portions of the roadway. <br /> • <br /> • <br /> F. EngineeringlCapital Projectsl9611-CR 512 Widening19611 JR 512 PHASE I M9611 Addendum No. 2 for CR512 Ph I Rdoc <br /> I <br />