Laserfiche WebLink
3: Sheet 7 of 74, Typical Section, of the CR 512 Phase IV Roadway Improvement construction <br />• drawings for the 4" sidewalk detail, *6" thick at Driveways (no extra charge) is hereby clarified as <br />follows: The Contractor shall thicken the proposed concrete sidewalk from 4" to 6" throughout all <br />driveway sections. The cost is to be included in the over all cost of the sidewalk per square yard. <br />4. SECTION 00310 — Bid Form, page 00310-4, Item 327-73, Milling Existing Asphalt Paving of the <br />ITEMIZED BID SCHEDULE description shall be amended to read (Milling Existing Asphalt <br />• Paving -1" Depth) <br />Milling and resurfacing thickness is called out to be 1" minimum in the Summary of Pay Items. <br />• Notes have been added to the plan sheets to call out the required thickness. This pay item quantity <br />includes milling and resurfacing at the west end of the project (Sta 34+00 to Sta 40+00). Sheets 9 <br />• & 10 of the CR 512 Phase IV Roadway Improvement construction drawings have been revised to <br />call out the thickness and limits of milling and resurfacing. <br />• 5. The Maintenance of Traffic between Station 34+30 and Station 40+00 shall be done per the FDOT <br />Design Standards for Design, Construction, Maintenance and Utility Operations on the State <br />Highway System, 2006, Index 600 through 670. <br />• 6. All suitable material excavated from the ponds shall be utilized for the roadway embankment. The <br />Contractor shall take measures to assure proper moisture content for compaction. All un -suitable <br />,. material shall be disposed of in a proper manner at the Contractors expense. <br />7. Soil fines according to the plans require no more than 8% fines passing the 200 sieve. The <br />.. specifications require no more than 12%. The 12% fines passing the 200 sieve shall govern. <br />8. Road work between stations 34+30 to 40+00 shall be widening only. Not reconstructed. <br />• 9. An additional sewer force main stub -out on the northwest comer of 1015` Avenue and CR 512 has <br />been added to Sheet U4 and the summary of pay items. IRCUD will handle all permitting related to <br />M the addition of this stub -out. <br />SECTION 00310 <br />— Bid Form, page 00310-7, <br />ITEMIZED BID <br />SCHEDULE - <br />• Item <br />Description <br />Quantity <br />unit unit price Amount <br />1543-111-008 <br />10"x 6" wet tap W/ valve <br />box 3 <br />EA <br />W Shall be amended to read: <br />(NEVA 1513-160-216 <br />Sanitary <br />sewer <br />force main (6"PVCI <br />70 <br />LF <br />• 1543-111-008 <br />10"x6" <br />wet tan <br />W/ valve box <br />4 <br />EA <br />10. Pay Item 102-3, Commercial Material — are units CY. <br />Commercial material is defined as material typically used for base, including recycled asphalt that <br />will provide a firm surface under wet conditions. Commercial material will be used primarily in the <br />temporary transitions between the existing and constructed portions of the roadway. <br />W <br />• <br />F. EngineeringlCapital Projectsl9611-CR 512 Widening19611 JR 512 PHASE I M9611 Addendum No. 2 for CR512 Ph I Rdoc <br />