38. Samples--Physical examples of gases, steam , liquid petroleum products, telephone or
<br /> materials , equipment, or workmanship that are other communications, cable television , water,
<br /> representative of some portion of the Work and which wastewater, storm water, other liquids or chemicals,
<br /> establish the standards by which such portion of the or traffic or other control systems.
<br /> r Work will be judged .
<br /> 47 . Unit Price Work--Work to be paid for on
<br /> 39. Shop Drawings--All drawings, diagrams , the basis of unit prices.
<br /> r illustrations , schedules, and other data or information
<br /> which are specifically prepared or assembled by or for 48. Work--The entire completed construction
<br /> CONTRACTOR and submitted by CONTRACTOR to or the various separately identifiable parts thereof re-
<br /> illustrate some portion of the Work. quired to be provided under the Contract Documents .
<br /> 'r Work includes and is the result of performing or
<br /> 40. Site--Lands or areas indicated in the providing all labor, services , and documentation
<br /> Contract Documents as being furnished by OWNER necessary to produce such construction , and
<br /> upon which the Work is to be performed , including furnishing , installing , and incorporating all materials
<br /> rights-of-way and easements for access thereto, and and equipment into such construction, all as required
<br /> such other lands furnished by OWNER which are by the Contract Documents.
<br /> designated for the use of CONTRACTOR.
<br /> � 49. Work Change Directive--A written
<br /> 41 . Specifications—That part of the Contract statement to CONTRACTOR issued on or after the
<br /> Documents consisting of written technical descriptions Effective Date of the Agreement and signed by
<br /> r� of materials, equipment, systems , standards, and OWNER and recommended by ENGINEER ordering
<br /> workmanship as applied to the Work and certain an addition , deletion , or revision in the Work, or
<br /> administrative details applicable thereto. responding to differing or unforeseen subsurface or
<br /> physical conditions under which the Work is to be
<br /> 411111 42. Subcontractor--An individual or entity performed or to emergencies. A Work Change
<br /> having a direct contract with CONTRACTOR or with Directive will not change the Contract Price or the
<br /> any other Subcontractor for the performance of a part Contract Times but is evidence that the parties expect
<br /> ,r of the Work at the Site. that the change ordered or documented by a Work
<br /> Change Directive will be incorporated in a subse-
<br /> 43. Substantial Completion—The time at quently issued Change Order following negotiations
<br /> which the Work (or a specified part thereof) has by the parties as to its effect, if any, on the Contract
<br /> progressed to the point where, in the opinion of Price or Contract Times .
<br /> ENGINEER, the Work (or a specified part thereof) is
<br /> sufficiently complete, in accordance with the Contract 50, Written Amendment--A written statement
<br /> �. Documents, so that the Work (or a specified part modifying the Contract Documents , signed by
<br /> thereof) can be utilized for the purposes for which it is OWNER and CONTRACTOR on or after the Effective
<br /> intended. The terms "substantially complete" and Date of the Agreement and normally dealing with the
<br /> "substantially completed" as applied to all or part of nonengineering or nontechnical rather than strictly
<br /> as the Work refer to Substantial Completion thereof. construction-related aspects of the Contract Docu-
<br /> ments .
<br /> 44. Supplementary Conditions—That part of
<br /> r the Contract Documents which amends or 1 .02 Terminology
<br /> supplements these General Conditions.
<br /> A. Intent of Certain Terms or Adjectives
<br /> 45. Supplier--A manufacturer, fabricator,
<br /> supplier, distributor, materialman , or vendor having a 1 . Whenever in the Contract Documents the
<br /> direct contract with CONTRACTOR or with any terms "as allowed ," "as approved ," or terms of like
<br /> Subcontractor to furnish materials or equipment to be effect or import are used , or the adjectives
<br /> incorporated in the Work by CONTRACTOR or any "reasonable,' "suitable,n "acceptable , " "proper,"
<br /> Subcontractor. "satisfactory,' or adjectives of like effect or import
<br /> are used to describe an action or determination of
<br /> 46. Underground Facilities--All underground ENGINEER as to the Work, it is intended that such
<br /> pipelines , conduits, ducts, cables, wires, manholes, action or determination will be solely to evaluate, in
<br /> vaults, tanks, tunnels, or other such facilities or general , the completed Work for compliance with
<br /> attachments, and any encasements containing such the requirements of and information in the
<br /> r facilities , including those that convey electricity, Contract Documents and conformance with the