Laserfiche WebLink
1W <br /> ■„ 17. Drawings--That part of the Contract 27 . Milestone--A principal event specified in <br /> Documents prepared or approved by ENGINEER the Contract Documents relating to an intermediate <br /> which graphically shows the scope , extent, and completion date or time prior to Substantial Comple- <br /> character of the Work to be performed by tion of all the Work. <br /> CONTRACTOR. Shop Drawings and other <br /> CONTRACTOR submittals are not Drawings as so 28. Notice of Award--The written notice by <br /> defined . OWNER to the apparent successful bidder stating <br /> that upon timely compliance by the apparent <br /> 18. Effective Date of the Agreement—The successful bidder with the conditions precedent listed <br /> date indicated in the Agreement on which it becomes therein , OWNER will sign and deliver the Agreement. <br /> effective, but if no such date is indicated , it means the <br /> r date on which the Agreement is signed and delivered 29. Notice to Proceed--A written notice given <br /> by the last of the two parties to sign and deliver. by OWNER to CONTRACTOR fixing the date on <br /> which the Contract Times will commence to run and <br /> �. 19. ENGINEER--The individual or entity on which CONTRACTOR shall start to perform the <br /> named as such in the Agreement. Work under the Contract Documents . <br /> on cnrrrntcco q;; rt An Ind 'yid al 30 . OWNER--The individual , entity, public <br /> • er entity having a contract with ENGINE rnish body, or authority with whom CONTRACTOR has <br /> services as ENGINEER's in ent professional entered into the Agreement and for whom the Work is <br /> associate or consul respect to the Project and to be performed . <br /> 1110 who is ied as such in the Supplementary <br /> 31 . Partial Utilization--Use by OWNER of a <br /> substantially completed part of the Work for the pur- <br /> 21 . Field Order--A written order issued by pose for which it is intended (or a related purpose) <br /> r ENGINEER which requires minor changes in the prior to Substantial Completion of all the Work. <br /> Work but which does not involve a change in the <br /> Contract Price or the Contract Times . 32. PCBs--Polychlorinated biphenyls. <br /> 22. Genera! Requirements--Sections of 33. Petroleum--Petroleum , including crude of <br /> Division 1 of the Specifications . The General or any fraction thereof which is liquid at standard <br /> Requirements pertain to all sections of the Specifica- conditions of temperature and pressure (60 degrees <br /> wtions. Fahrenheit and 14.7 pounds per square inch <br /> absolute) , such as oil , petroleum , fuel oil , oil sludge , <br /> 23 . Hazardous Environmental Condition--The oil refuse, gasoline, kerosene, and oil mixed with <br /> presence at the Site of Asbestos, PCBs , Petroleum , other non-Hazardous Waste and crude oils . <br /> Hazardous Waste , or Radioactive Material in such <br /> quantities or circumstances that may present a 34. Project--The total construction of which <br /> substantial danger to persons or property exposed the Work to be performed under the Contract <br /> thereto in connection with the Work. Documents may be the whole , or a part as may be <br /> indicated elsewhere in the Contract Documents. <br /> 24 . Hazardous Waste--The term Hazardous <br /> Waste shall have the meaning provided in Section 35 . Project Manual--The bound documentary <br /> 1004 of the Solid Waste Disposal Act (42 USC information prepared for bidding and constructing the <br /> Section 6903) as amended from time to time. Work. A listing of the contents of the Project Manual, <br /> which may be bound in one or more volumes, is <br /> +' 25. Laws and Regulations; Laws or Regulat- contained in the table(s) of contents . <br /> ions--Any and all applicable laws, rules, regulations , <br /> ordinances, codes , and orders of any and all govern- 36. Radioactive Material--Source , special <br /> mental bodies , agencies , authorities, and courts nuclear, or byproduct material as defined by the <br /> having jurisdiction . Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> seq . ) as amended from time to time . <br /> 26 . Liens--Charges, security interests , or <br /> encumbrances upon Project funds, real property, or 37. Resident Project Representative--The <br /> personal property. authorized representative of ENGINEER who may be <br /> assigned to the Site or any part thereof. <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 6 <br /> F:\EngineedngUWilliamsWasterContracOMaster Contract Documents=700 - General Conditions REV 04-07.doc <br />