Laserfiche WebLink
r <br />so <br />Md <br />go <br />M <br />r <br />Mr <br />r <br />• <br />L <br />C7 <br />M <br />M <br />M <br />Mr <br />G <br />C" <br />removal, relocation, or replacement in the <br />course of construction. <br />B. CONTRACTOR shall comply with all applica- <br />ble Laws and Regulations relating to the safety of <br />persons or property, or to the protection of persons or <br />property from damage, injury, or loss; and shall erect <br />and maintain all necessary safeguards for such safety <br />and protection. CONTRACTOR shall notify owners of <br />adjacent property and of Underground Facilities and <br />other utility owners when prosecution of the Work <br />may affect them, and shall cooperate with them in the <br />protection, removal, relocation, and replacement of <br />their property. All damage, injury, or loss to any <br />property referred to in paragraph 6.13.A.2 or 6.13.A.3 <br />caused, directly or indirectly, in whole or in part, by <br />CONTRACTOR, any Subcontractor, Supplier, or any <br />other individual or entity directly or indirectly employed <br />by any of them to perform any of the Work, or anyone <br />for whose acts any of them may be liable, shall be <br />remedied by CONTRACTOR (except damage or loss <br />attributable to the fault of Drawings or Specifications <br />or to the acts or omissions of OWNER or ENGINEER <br />or ENGINEER's Consultant, or anyone employed by <br />any of them, or anyone for whose acts any of them <br />may be liable, and not attributable, directly or <br />indirectly, in whole or in part, to the fault or negligence <br />of CONTRACTOR or any Subcontractor, Supplier, or <br />other individual or entity directly or indirectly employed <br />by any of them). CONTRACTOR's duties and <br />responsibilities for safety and for protection of the <br />Work shall continue until such time as all the Work is <br />completed and ENGINEER has issued a notice to <br />OWNER and CONTRACTOR in accordance with <br />paragraph 14.07.6 that the Work is acceptable <br />(except as otherwise expressly provided in connection <br />with Substantial Completion). <br />6.14 Safety Representative <br />A. CONTRACTOR shall designate a qualified <br />and experienced safety representative at the Site <br />whose duties and responsibilities shall be the <br />prevention of accidents and the maintaining and <br />supervising of safety precautions and programs. <br />6.15 Hazard Communication Programs <br />A. CONTRACTOR shall be responsible for <br />coordinating any exchange of material safety data <br />sheets or other hazard communication information <br />required to be made available to or exchanged be- <br />tween or among employers at the Site in accordance <br />with Laws or Regulations. <br />6.16 Emergencies <br />A. In emergencies affecting the safety or protec- <br />tion of persons or the Work or property at the Site or <br />adjacent thereto, CONTRACTOR is obligated to act to <br />prevent threatened damage, injury, or loss. <br />CONTRACTOR shall give ENGINEER prompt written <br />notice if CONTRACTOR believes that any significant <br />changes in the Work or variations from the Contract <br />Documents have been caused thereby or are <br />required as a result thereof. If ENGINEER <br />determines that a change in the Contract Documents <br />is required because of the action taken by <br />CONTRACTOR in response to such an emergency, a <br />Work Change Directive or Change Order will be <br />issued. <br />6.17 Shop Drawings and Samples <br />A. CONTRACTOR shall submit Shop Drawings <br />to ENGINEER for review and approval in accordance <br />with the acceptable schedule of Shop Drawings and <br />Sample submittals. All submittals will be identified as <br />ENGINEER may require and in the number of copies <br />specified in the General Requirements. The data <br />shown on the Shop Drawings will be complete with <br />respect to quantities, dimensions, specified perfor- <br />mance and design criteria, materials, and similar data <br />to show ENGINEER the services, materials, and <br />equipment CONTRACTOR proposes to provide and <br />to enable ENGINEER to review the information for the <br />limited purposes required by paragraph 6.17.E. <br />B. CONTRACTOR shall also submit Samples to <br />ENGINEER for review and approval in accordance <br />with the acceptable schedule of Shop Drawings and <br />Sample submittals. Each Sample will be identified <br />clearly as to material, Supplier, pertinent data such as <br />catalog numbers, and the use for which intended and <br />otherwise as ENGINEER may require to enable <br />ENGINEER to review the submittal for the limited <br />purposes required by paragraph 6.17.E. The numbers <br />of each Sample to be submitted will be as specified in <br />the Specifications. <br />C. Where a Shop Drawing or Sample is required <br />by the Contract Documents or the schedule of Shop <br />Drawings and Sample submittals acceptable to ENGI- <br />NEER as required by paragraph 2.07, any related <br />Work performed prior to ENGINEER's review and <br />approval of the pertinent submittal will be at the sole <br />expense and responsibility of CONTRACTOR. <br />D. Submittal Procedures <br />1. Before submitting each Shop <br />Drawing or Sample, CONTRACTOR shall have <br />determined and verified: <br />00700-24 <br />F:%EngineeringWWilliam WaslerCo tac6Naster Contact Dowments=700-General Concams REV 04-07.dac <br />00700 - Geneal Conditions REV 04-07 <br />