My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:32:24 AM
Creation date
9/30/2015 11:52:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (2)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />so <br />Md <br />go <br />M <br />r <br />Mr <br />r <br />• <br />L <br />C7 <br />M <br />M <br />M <br />Mr <br />G <br />C" <br />removal, relocation, or replacement in the <br />course of construction. <br />B. CONTRACTOR shall comply with all applica- <br />ble Laws and Regulations relating to the safety of <br />persons or property, or to the protection of persons or <br />property from damage, injury, or loss; and shall erect <br />and maintain all necessary safeguards for such safety <br />and protection. CONTRACTOR shall notify owners of <br />adjacent property and of Underground Facilities and <br />other utility owners when prosecution of the Work <br />may affect them, and shall cooperate with them in the <br />protection, removal, relocation, and replacement of <br />their property. All damage, injury, or loss to any <br />property referred to in paragraph 6.13.A.2 or 6.13.A.3 <br />caused, directly or indirectly, in whole or in part, by <br />CONTRACTOR, any Subcontractor, Supplier, or any <br />other individual or entity directly or indirectly employed <br />by any of them to perform any of the Work, or anyone <br />for whose acts any of them may be liable, shall be <br />remedied by CONTRACTOR (except damage or loss <br />attributable to the fault of Drawings or Specifications <br />or to the acts or omissions of OWNER or ENGINEER <br />or ENGINEER's Consultant, or anyone employed by <br />any of them, or anyone for whose acts any of them <br />may be liable, and not attributable, directly or <br />indirectly, in whole or in part, to the fault or negligence <br />of CONTRACTOR or any Subcontractor, Supplier, or <br />other individual or entity directly or indirectly employed <br />by any of them). CONTRACTOR's duties and <br />responsibilities for safety and for protection of the <br />Work shall continue until such time as all the Work is <br />completed and ENGINEER has issued a notice to <br />OWNER and CONTRACTOR in accordance with <br />paragraph 14.07.6 that the Work is acceptable <br />(except as otherwise expressly provided in connection <br />with Substantial Completion). <br />6.14 Safety Representative <br />A. CONTRACTOR shall designate a qualified <br />and experienced safety representative at the Site <br />whose duties and responsibilities shall be the <br />prevention of accidents and the maintaining and <br />supervising of safety precautions and programs. <br />6.15 Hazard Communication Programs <br />A. CONTRACTOR shall be responsible for <br />coordinating any exchange of material safety data <br />sheets or other hazard communication information <br />required to be made available to or exchanged be- <br />tween or among employers at the Site in accordance <br />with Laws or Regulations. <br />6.16 Emergencies <br />A. In emergencies affecting the safety or protec- <br />tion of persons or the Work or property at the Site or <br />adjacent thereto, CONTRACTOR is obligated to act to <br />prevent threatened damage, injury, or loss. <br />CONTRACTOR shall give ENGINEER prompt written <br />notice if CONTRACTOR believes that any significant <br />changes in the Work or variations from the Contract <br />Documents have been caused thereby or are <br />required as a result thereof. If ENGINEER <br />determines that a change in the Contract Documents <br />is required because of the action taken by <br />CONTRACTOR in response to such an emergency, a <br />Work Change Directive or Change Order will be <br />issued. <br />6.17 Shop Drawings and Samples <br />A. CONTRACTOR shall submit Shop Drawings <br />to ENGINEER for review and approval in accordance <br />with the acceptable schedule of Shop Drawings and <br />Sample submittals. All submittals will be identified as <br />ENGINEER may require and in the number of copies <br />specified in the General Requirements. The data <br />shown on the Shop Drawings will be complete with <br />respect to quantities, dimensions, specified perfor- <br />mance and design criteria, materials, and similar data <br />to show ENGINEER the services, materials, and <br />equipment CONTRACTOR proposes to provide and <br />to enable ENGINEER to review the information for the <br />limited purposes required by paragraph 6.17.E. <br />B. CONTRACTOR shall also submit Samples to <br />ENGINEER for review and approval in accordance <br />with the acceptable schedule of Shop Drawings and <br />Sample submittals. Each Sample will be identified <br />clearly as to material, Supplier, pertinent data such as <br />catalog numbers, and the use for which intended and <br />otherwise as ENGINEER may require to enable <br />ENGINEER to review the submittal for the limited <br />purposes required by paragraph 6.17.E. The numbers <br />of each Sample to be submitted will be as specified in <br />the Specifications. <br />C. Where a Shop Drawing or Sample is required <br />by the Contract Documents or the schedule of Shop <br />Drawings and Sample submittals acceptable to ENGI- <br />NEER as required by paragraph 2.07, any related <br />Work performed prior to ENGINEER's review and <br />approval of the pertinent submittal will be at the sole <br />expense and responsibility of CONTRACTOR. <br />D. Submittal Procedures <br />1. Before submitting each Shop <br />Drawing or Sample, CONTRACTOR shall have <br />determined and verified: <br />00700-24 <br />F:%EngineeringWWilliam WaslerCo tac6Naster Contact Dowments=700-General Concams REV 04-07.dac <br />00700 - Geneal Conditions REV 04-07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.