My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:10:41 AM
Creation date
9/30/2015 11:52:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (2)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> a. all field measurements, quantities, <br /> dimensions, specified performance criteria , 2. ENGINEER's review and approval <br /> installation requirements, materials, catalog will not extend to means , methods , techniques, <br /> numbers, and similar information with sequences , or procedures of construction <br /> • respect thereto; (except where a particular means, method , <br /> technique, sequence , or procedure of con- <br /> b. all materials with respect to intended struction is specifically and expressly called for <br /> r use, fabrication , shipping , handling, storage, by the Contract Documents) or to safety <br /> assembly, and installation pertaining to the precautions or programs incident thereto . The <br /> performance of the Work; review and approval of a separate item as such <br /> will not indicate approval of the assembly in <br /> • c. all information relative to means , which the item functions . <br /> methods, techniques, sequences , and <br /> procedures of construction and safety 3. ENGINEER's review and approval of <br /> 10 precautions and programs incident thereto; Shop Drawings or Samples shall not relieve <br /> and CONTRACTOR from responsibility for any <br /> variation from the requirements of the Contract <br /> d. CONTRACTOR shall also have Documents unless CONTRACTOR has in <br /> r reviewed and coordinated each Shop writing called ENGINEER's attention to each <br /> Drawing or Sample with other Shop such variation at the time of each submittal as <br /> Drawings and Samples and with the required by paragraph 6. 17 .D .3 and ENGI- <br /> r requirements of the Work and the Contract NEER has given written approval of each such <br /> Documents . variation by specific written notation thereof <br /> incorporated in or accompanying the Shop <br /> 2 . Each submittal shall bear a stamp or Drawing or Sample approval ; nor will any <br /> r specific written indication that CONTRACTOR approval by ENGINEER relieve CON- <br /> has satisfied CONTRACTOR's obligations TRACTOR from responsibility for complying <br /> under the Contract Documents with respect to with the requirements of paragraph 6. 17 . D . 1 . <br /> r CONTRACTOR's review and approval of that <br /> submittal . F. Resubmittal Procedures <br /> 3. At the time of each submittal, CON- 1 . CONTRACTOR shall make correc- <br /> r TRACTOR shall give ENGINEER specific tions required by ENGINEER and shall return <br /> written notice of such variations , if any, that the the required number of corrected copies of <br /> Shop Drawing or Sample submitted may have Shop Drawings and submit as required new <br /> r from the requirements of the Contract Samples for review and approval. CON- <br /> Documents, such notice to be in a written com- TRACTOR shall direct specific attention in <br /> munication separate from the submittal; and , in writing to revisions other than the corrections <br /> addition , shall cause a specific notation to be called for by ENGINEER on previous <br /> �+ made on each Shop Drawing and Sample sub- submittals. <br /> mitted to ENGINEER for review and approval <br /> of each such variation . 6 . 18 Continuing the Work <br /> r <br /> E. ENGINEER 's Review A. CONTRACTOR shall carry on the Work and <br /> adhere to the progress schedule during all disputes or <br /> 1 . ENGINEER will timely review and disagreements with OWNER. No Work shall be <br /> approve Shop Drawings and Samples in delayed or postponed pending resolution of any <br /> accordance with the schedule of Shop disputes or disagreements, except as permitted by <br /> Drawings and Sample submittals acceptable to paragraph 15.04 or as OWNER and CONTRACTOR <br /> ENGINEER. ENGINEER's review and may otherwise agree in writing . <br /> approval will be only to determine if the items <br /> covered by the submittals will , after installation 6 . 19 CONTRACTOR 's General Warranty and <br /> or incorporation in the Work, conform to the Guarantee <br /> information given in the Contract Documents <br /> and be compatible with the design concept of A. CONTRACTOR warrants and guarantees to <br /> the completed Project as a functioning whole OWNER, ENGINEER, and ENGINEER's Consultants <br /> r as indicated by the Contract Documents. that all Work will be in accordance with the Contract <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 25 <br /> FtlEngineedngWWillia==aster ontrac Master Contract Docum nts\00700 - General Conditions REV 04.07.Eoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.