Laserfiche WebLink
Supplier, or any other person or organization , or to with inspection and testing personnel to facilitate <br /> any surety for or employee or agent of any of them, required inspections or tests. <br /> for damages arising out of or resulting from: <br /> B . OWNER shall 8FRPIE)y and Pay 40 tiEna <br /> r 1 . delays caused by or within the services of an independent testing laborato t0 <br /> control of CONTRACTOR; or perform all inspections , tests , or approvals re red by <br /> the Contract Documents except: <br /> 2. delays beyond the control of both <br /> OWNER and CONTRACTOR including but not 1 . for inspections, to or approvals <br /> limited to fires, floods, epidemics , abnormal covered by paragraphs 1 3 .0 and 13 .03 .D <br /> weather conditions, acts of God , or acts or below; <br /> • neglect by utility owners or other contractors <br /> performing other work as contemplated by 2. that co incurred in connection with <br /> Article 7 . tests or insp tions conducted pursuant to <br /> paragraph .04. 13 shall be paid as provided in <br /> B . Nothing in this paragraph 12.06 bars a said par raph 13 .04. 13 ; and <br /> change in Contract Price pursuant to this Article 12 to <br /> compensate CONTRACTOR due to delay, 3. as otherwise specifically provided in <br /> interference, or disruption directly attributable toIM n <br /> actions or inactions of OWNER or anyone for whom <br /> OWNER is responsible. C. If Laws or Regulations of any public body <br /> 40 having jurisdiction require any Work (or part thereof) <br /> specifically to be inspected , tested , or approved by an <br /> ARTICLE 13 - TESTS AND INSPECTIONS ; employee or other representative of such public body, <br /> CORRECTION , REMOVAL OR ACCEPTANCE OF CONTRACTOR shall assume full responsibility for <br /> r DEFECTIVE WORK arranging and obtaining such inspections, tests , or <br /> approvals , pay all costs in connection therewith , and <br /> furnish ENGINEER the required certificates of inspec- <br /> 10 tion or approval . <br /> 13 .01 Notice of Defects <br /> D. CONTRACTOR shall be responsible for <br /> A. Prompt notice of all defective Work of which arranging and obtaining and shall pay all costs in <br /> OWNER or ENGINEER has actual knowledge will be connection with any inspections , tests, or approvals <br /> given to CONTRACTOR. All defective Work may be required for OWNER's and ENGINEER's acceptance <br /> rejected , corrected , or accepted as provided in this of materials or equipment to be incorporated in the <br /> Article 13 . Work; or acceptance of materials , mix designs , or <br /> equipment submitted for approval prior to <br /> 13 .02 Access to Work CONTRACTOR's purchase thereof for incorporation <br /> in the Work. Such inspections, tests, or approvals <br /> w A. OWNER, ENGINEER, ENGINEER's Con- shall be performed by organizations acceptable to <br /> sultants, other representatives and personnel of OWNER and ENGINEER. <br /> OWNER, independent testing laboratories , and <br /> governmental agencies with jurisdictional interests will E . If any Work (or the work of others) that is to <br /> have access to the Site and the Work at reasonable be inspected , tested , or approved is covered by CON - <br /> times for their observation , inspecting , and testing . TRACTOR without written concurrence of ENGI- <br /> CONTRACTOR shall provide them proper and safe NEER, it must, if requested by ENGINEER, be uncov- <br /> ar conditions for such access and advise them of ered for observation . <br /> CONTRACTOR's Site safety procedures and <br /> programs so that they may comply therewith as F. Uncovering Work as provided in paragraph <br /> applicable. 13.03 . E shall be at CONTRACTOR's expense unless <br /> CONTRACTOR has given ENGINEER timely notice <br /> 13 .03 Tests and Inspections of CONTRACTOR's intention to cover the same and <br /> ENGINEER has not acted with reasonable prompt- <br /> A. CONTRACTOR shall give ENGINEER timely ness in response to such notice. <br /> notice of readiness of the Work for all required <br /> inspections , tests, or approvals and shall cooperate 13 .04 Uncovering Work <br /> w <br /> 00700 - General Conditions REV N4 7 <br /> 00700 - 36 <br /> F:lEngineenngVWilliamslMaserContr cC,Master Contract Domments100700 - General Condibons REV 04-07.doc <br />