Laserfiche WebLink
Min <br /> to <br /> y, A. If any Work is covered contrary to the written 13.06 Correction or Removal of Defective Work <br /> request of ENGINEER, it must, if requested by ENGI- <br /> NEER, be uncovered for ENGINEER's observation A. CONTRACTOR shall correct all defective <br /> and replaced at CONTRACTOR's expense. Work, whether or not fabricated , installed , or <br /> completed , or, if the Work has been rejected by <br /> B . If ENGINEER considers it necessary or ENGINEER, remove it from the Project and replace it <br /> advisable that covered Work be observed by ENGI- with Work that is not defective. CONTRACTOR shall <br /> M NEER or inspected or tested by others, CONTRAC- pay all Claims, costs , losses, and damages (including <br /> TOR, at ENGINEER's request, shall uncover, expose , but not limited to all fees and charges of engineers, <br /> or otherwise make available for observation , inspec- architects , attorneys , and other professionals and all <br /> tion, or testing as ENGINEER may require, that court or arbitration or other dispute resolution costs) <br /> r portion of the Work in question, furnishing all neces- arising out of or relating to such correction or removal <br /> sary labor, material, and equipment. If it is found that (including but not limited to all costs of repair or <br /> such Work is defective, CONTRACTOR shall pay all replacement of work of others). <br /> Claims , costs, losses, and damages (including but not <br /> limited to all fees and charges of engineers , 13 . 07 Correction Period <br /> architects, attorneys, and other professionals and all <br /> court or arbitration or other dispute resolution costs) A. If within one year after the date of Substantial <br /> arising out of or relating to such uncovering , Completion or such longer period of time as may be <br /> exposure, observation , inspection , and testing , and of prescribed by Laws or Regulations or by the terms of <br /> satisfactory replacement or reconstruction (including any applicable special guarantee required by the <br /> 40 but not limited to all costs of repair or replacement of Contract Documents or by any specific provision of <br /> work of others); and OWNER shall be entitled to an the Contract Documents, any Work is found to be <br /> appropriate decrease in the Contract Price. If the defective, or if the repair of any damages to the land <br /> parties are unable to agree as to the amount thereof, or areas made available for CONTRACTOR's use by <br /> 4' OWNER may make a Claim therefor as provided in OWNER or permitted by Laws and Regulations as <br /> paragraph 10 . 05. If, however, such Work is not found contemplated in paragraph 6 . 11 .A is found to be <br /> to be defective, CONTRACTOR shall be allowed an defective, CONTRACTOR shall promptly, without cost <br /> • increase in the Contract Price or an extension of the to OWNER and in accordance with OWNER's written <br /> Contract Times (or Milestones), or both, directly instructions : (i) repair such defective land or areas, or <br /> attributable to such uncovering , exposure , (ii ) correct such defective Work or, if the defective <br /> observation , inspection , testing , replacement, and Work has been rejected by OWNER, remove it from <br /> reconstruction. If the parties are unable to agree as to the Project and replace it with Work that is not <br /> the amount or extent thereof, CONTRACTOR may defective, and (iii ) satisfactorily correct or repair or <br /> make a Claim therefor as provided in paragraph remove and replace any damage to other Work, to the <br /> 40 10. 05. work of others or other land or areas resulting there- <br /> from . If CONTRACTOR does not promptly comply <br /> 13 .05 OWNER May Stop the Work with the terms of such instructions , or in an <br /> emergency where delay would cause serious risk of <br /> +p A If the Work Is defeetiye or QQ loss or damage, OWNER may have the defective <br /> fails to supply sufficient skilled workers or table Work corrected or repaired or may have the rejected <br /> materials or equipment, or fails to perform e Work in Work removed and replaced , and all Claims , costs , <br /> such a way that the completed Wor III conform to losses, and damages ( including but not limited to all <br /> the Contract Documents, OWN may order CON- fees and charges of engineers, architects , attorneys , <br /> TRACTOR to stop the Work r any portion thereof, and other professionals and all court or arbitration or <br /> until the cause for such der has been eliminated ; other dispute resolution costs ) arising out of or <br /> ME however, this right of NER to stop the Work shall relating to such correction or repair or such removal <br /> not give rise to duty on the part of OWNER to and replacement (including but not limited to all costs <br /> exercise this ht for the benefit of CONTRACTOR, of repair or replacement of work of others) will be paid <br /> r, any Sub tractor, any Supplier, any other individual by CONTRACTOR. <br /> B. In special circumstances where a particular <br /> item of equipment is placed in continuous service <br /> 40 before Substantial Completion of all the Work, the <br /> correction period for that item may start to run from an <br /> earlier date if so provided in the Specifications or by <br /> on Written Amendment. <br /> 00700 - Geneal Conditions REV 04-07 <br /> 00700 - 37 <br /> FdEngineeringVWilliamslMasterConVac Master Contact Doouments=700 - General Conditions REV 04-07.doc <br /> 1111011 <br />