My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:32:24 AM
Creation date
9/30/2015 11:52:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (2)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />• <br />Work or for the means, methods, techniques, <br />sequences, or procedures of construction, or <br />the safety precautions and programs incident <br />thereto, or for CONTRACTOR's failure to <br />• <br />comply with Laws and Regulations applicable <br />to CONTRACTOR's performance of the Work. <br />Additionally, said review or recommendation <br />w <br />will not impose responsibility on ENGINEER to <br />make any examination to ascertain how or for <br />what purposes CONTRACTOR has used the <br />moneys paid on account of the Contract Price, <br />w <br />or to determine that title to any of the Work, <br />materials, or equipment has passed to <br />OWNER free and clear of any Liens. <br />• <br />5. ENGINEER may refuse to recom- <br />mend the whole or any part of any payment if, <br />in ENGINEER's opinion, it would be incorrect <br />w <br />to make the representations to OWNER <br />referred to in paragraph 14.02.13.2. ENGI- <br />NEER may also refuse to recommend any <br />• <br />such payment or, because of subsequently <br />discovered evidence or the results of subse- <br />quent inspections or tests, revise or revoke any <br />such payment recommendation previously <br />ow <br />made, to such extent as may be necessary in <br />ENGINEER's opinion to protect OWNER from <br />loss because: <br />• <br />a. the Work is defective, or completed <br />Work has been damaged, requiring <br />correction or replacement; <br />• <br />b. the Contract Price has been reduced <br />by Written Amendment or Change Orders; <br />• <br />c. OWNER has been required to <br />correct defective Work or complete Work in <br />accordance with paragraph 13.09; or <br />• <br />the occurrene any of the events <br />C. Payment Becomes Due <br />40 1. TER days afte� <br />Application for Payment to O with <br />ENGINEER's recomme n, the amount <br />• recommended w' ject to the provisions of <br />paragra . 2.D) become due, and when <br />du All" hp nnid hir OWNFR to CONTRA <br />TOR. <br />• <br />in <br />1• <br />D. Reduction in Payment <br />1. OWNER may refuse to make <br />payment of the full amount recommended by <br />ENGINEER because: <br />a. claims have been made against <br />OWNER on account of CONTRACTOR's <br />performance orfumishing of the Work; <br />b. Liens have been filed in connection <br />with the Work, except where <br />CONTRACTOR has delivered a specific <br />Bond satisfactory to OWNER to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling OWN- <br />ER to a set-off against the amount <br />recommended; or <br />d. OWNER has actual knowledge of the <br />occurrence of any of the events <br />enumerated in paragraphs 14.02.B.5.a <br />through 14.02.B.5.c or paragraph 15.02.A. <br />2. If OWNER refuses to make payment <br />of the full amount recommended by <br />ENGINEER, OWNER must give <br />CONTRACTOR immediate written notice (with <br />a copy to ENGINEER) stating the reasons for <br />such action and promptly pay CONTRACTOR <br />any amount remaining after deduction of the <br />amount so withheld. OWNER shall promptly <br />pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />corrects to OWNER's satisfaction the reasons <br />for such action. <br />3. If it is subsequently determined that <br />OWNER's refusal of payment was not justified, <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14.02.C.1. <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment cov- <br />ered by any Application for Payment, whether incor- <br />porated in the Project or not, will pass to OWNER no <br />later than the time of payment free and clear of all <br />Liens. <br />00700-40 <br />F.\EngineeringV W illiamsWas erGmtract\Master Contac[ DocumentsW0700 - General conditions REV 04-07.doc <br />00700 - General Conddions REV 04-07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.