My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:12:15 AM
Creation date
9/30/2015 11:52:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (3)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting Specifications and Contract
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> SECTION 01215 <br /> r GENERAL QUALITY CONTROL <br /> • 1 . 1 DESCRIPTION OF REQUIREMENTS <br /> A. Definitions : Specific quality control requirements for the work are indicated <br /> r throughout the Contract Documents . The requirements of this section are <br /> primarily related to the performance of the work beyond the furnishing of <br /> manufactured products . The term "Quality Control' includes , but is not <br /> r necessarily limited to , inspection and testing and associat6d requirements . <br /> This section does not specify or modify the OWNER and ENGINEER duties <br /> relating to quality review and Contract surveillance . <br /> • <br /> 1 . 2 RESPONSIBILITY FOR INSPECTIONS AND TESTS <br /> +� A . Residual OWNER Responsibility: The OWNER will employ and pay for the <br /> services of independent testing laboratories to perform those required <br /> inspections and tests . <br /> r <br /> B . CONTRACTORS General Responsibility: No failure of test agencies , whether <br /> engaged by the OWNER or CONTRACTOR , to perform adequate inspections <br /> of tests or to properly analyze or report results , shall relieve the <br /> CONTRACTOR of responsibility for the fulfillment of the requirements of the <br /> Contract Documents . It is recognized that the required inspection and testing <br /> • program is intended to assist the CONTRACTOR , OWNER , ENGINEER, and . <br /> governing authorities in the nominal determination of probable compliance with <br /> requirements for certain crucial elements of work. The program is not intended <br /> • to limit the CONTRACTOR in his regular quality control program , as needed for <br /> general assurance of compliance. <br /> 1 . 3 QUALITY ASSURANCE <br /> A. General Workmanship Standards : It is a requirement that each category of <br /> `r tradesman or installer performing the work be pre-qualified , to the extent of being <br /> familiar with the applicable and recognized quality standards for his category of <br /> r work, and being capable of workmanship complying with those standards . <br /> 1 .4 PRODUCT DELIVERY-STORAGE- HANDLING <br /> • Handle , store and protect materials and products , including fabricated components , by <br /> methods and means which will prevent damage , deterioration and losses (and resulting <br /> delays) , thereby ensuring highest quality results as the performance of the work <br /> progresses . Control delivery schedules so as to minimize unnecessary long-term <br /> storage at the project site prior to installation . <br /> r <br /> 01215-1 01215 General Quality Control <br /> F9Engineering\Capital Projects\9611 -CR 512 Widening\9611 CR 512 PHASE MContract Documents\01215 General Quality.doc <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.