Laserfiche WebLink
1 . 5 PROJECT PHOTOGRAPHS/VIDEOS <br /> A. The CONTRACTOR shall make provisions , at his expense, for video tapes of all <br /> work areas just prior to construction , and for unusual conditions during construction . <br /> The videos shall show pertinent physical features along the line of construction . <br /> The purpose of the videos is to determine any damage to private or public property <br /> during construction . <br /> B . Pre-Construction Video : <br /> 1 . Contractor shall provide the Owner with a video record and one copy of the <br /> existing conditions prior to construction . This video shall be a standard VHS <br /> cassette format, and shall be narrated . <br /> .r 2 . The video shall include , but not be limited to, the following items shown in a <br /> clear manner: <br /> 1 ) All existing features within the right-of-way . <br /> .. 2 ) All existing features within the temporary construction easement. <br /> 3 ) All existing features within permanent easements. <br /> 4) All existing features adjacent to any construction . <br /> 3 . Detail of the video shall be such that the following examples shall be clear and <br /> visible: <br /> 1 ) Cracks in walls. <br /> 2 ) Condition of fencing . <br /> 3) Condition of planted areas and types of vegetation . <br /> 4) Condition of sodded areas . <br /> S) Conditions of sprinkler systems and associated controls and wiring . <br /> 6) Condition of signs . <br /> 7) Conditions of lighting and associated wiring . <br /> 8) Significant detail of any pre-existing damages physical features shall be <br /> shown . The coverage of the video should include the limits of effects of <br /> the use of vibratory rollers . <br /> 9 ) This video record shall be presented to the Owner within 30 days of the <br /> Notice to Proceed . A copy shall be kept in the Contractor's field office . <br /> 10) Payment — No additional payment will be made for this work. <br /> + + END OF SECTION + + <br /> r <br /> r <br /> 01215-2 01215 General Quality Control <br /> F:\Engineering\Capital Projects\9611 -CR 512 Widening\9611 CR 512 PHASE MContract Documents\01215 General Quality.doc <br />