.. <br />M <br />1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br />A. After receiving approval by the ENGINEER, distribute copies of the <br />approved initial schedule and all reviewed revisions (updated) to: <br />1. Job site file. <br />2. Subcontractors. <br />3. Other concerned parties. <br />4. OWNER (two copies). <br />5. ENGINEER <br />r B. In the cover letter, instruct recipients to report promptly to the <br />CONTRACTOR, in writing, any problems anticipated by the projections <br />shown in the schedules. <br />+ + END OF SECTION + + <br />F- <br />71 <br />W <br />W <br />n <br />n <br />M <br />01310-2 01310 Construction Schedule <br />F:\Engineering\Capital Projects\9611-CR 512 Widening\9611 CR 512 PHASE I\Acontract Documents101310 -Construction <br />Schedule.doc <br />M <br />