My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:12:15 AM
Creation date
9/30/2015 11:52:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (3)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting Specifications and Contract
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 01340 - Submittal of Shop Drawings . doc <br /> M . Upon return of a submittal marked " Revise and Resubmit" , make the <br /> corrections indicated and repeat the initial approval procedure . The " Not <br /> r Approved" notation is used to indicate material or equipment that is not <br /> acceptable. Upon return of a submittal so marked , repeat the initial <br /> r approval procedure utilizing acceptable_ material or equipment. <br /> N . Any related Work performed or equipment installed without an "Approved" <br /> or "Approved as Corrected" Shop Drawing will be at the sole responsibility <br /> of the CONTRACTOR . <br /> r O . Submit Sop Drawings well in advance of the need for 'the material or <br /> equipment for construction and with ample allowance for the time required <br /> to make delivery of material or equipment after data covering such is <br /> r approved . CONTRACTOR shall assume the risk for all materials or <br /> equipment which is fabricated or delivered prior to the approval of Shop <br /> Drawings . Materials or equipment will not be included in periodic progress <br /> r., payments until approval thereof has been obtained in the specified <br /> manner. <br /> r P . ENGINEER will review and process all submittals promptly, but a <br /> reasonable time should be allowed for this , for the Shop Drawings being <br /> revised and resubmitted , and for time required to return the approved <br /> r Shop Drawings to CONTRACTOR. <br /> Q . Furnish required submittals with complete information and accuracy in <br /> r order to achieve required approval of an item within three submittals . All _ <br /> costs to ENGINEER involved with subsequent submittals of Shop <br /> Drawings , Samples or other items requiring approval , will be back-charged <br /> • to CONTRACTOR in accordance with the General Conditions and the <br /> Supplementary Conditions . If the CONTRACTOR requests a substitution <br /> for a previously approved item , all of ENGINEER'S costs in the reviewing <br /> and approval of the substitution will be back-charged to CONTRACTOR <br /> unless the need for such substitution is beyond the control of <br /> CONTRACTOR. <br /> r <br /> + + END OF SECTION + + <br /> r <br /> a <br /> 01340 - Submittal of Shop Drawings.doc <br /> 01340-6 <br /> FAEngineeringZapitaI Projects19611 -CR 512 Widening19611 CR 512 PHASE MContract Documenti;V340 - Submittal of Shop Drawings.doe <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.