Laserfiche WebLink
"' SECTION 01520 <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br />r B. TEMPORARY SANITARY FACILITIES <br />1. Provide temporary toilet facilities separate from the job office. <br />Maintain these during the entire .period of construction under this <br />Contract for the use of all construction personnel on the job. <br />Provide enough chemical toilets to conveniently serve the needs of <br />., all personnel. Properly seclude toilet facilities from public <br />observation. <br />2. Chemical toilets and their maintenance shall meet the requirements <br />r of State and local health regulations and ordinances. Immediately <br />correct any facilities or maintenance methods failing to meet these <br />requirements. Upon completion of work, remove the facilities from <br />w the premises. <br />1.4 SECURITY <br />Full time watchmen will not be specifically, required as a part of the Contract, but <br />the CONTRACTOR shall provide inspection of work area daily and shall take <br />as whatever measures are necessary to protect the safety of the public, workmen, <br />and materials, and provide for the security of the site, both day and night. <br />W 1.5 TEMPORARY CONTROLS <br />Take all necessary precautions to control dust and mud associated with the work <br />of this Contract. In dry weather, spray dusty areas daily with water in order to <br />control dust. Take necessary steps to prevent the tracking of mud onto adjacent <br />streets and highways. <br />1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br />Remove the various temporary facilities, services, and controls and legally <br />dispose of them as soon as the work is complete. The areas of the site used for <br />temporary facilities shall be properly reconditioned and restored to a condition <br />acceptable to the OWNER. <br />+ + END OF SECTION + + <br />0 <br />01520-2 <br />FAEngineering\Capital Projects\9611-CR 512 Widening\9617 CR 512 PHASE IV\Contract Documents\01520 -Construction <br />40 Facilities.doc <br />