|
aw
<br />so
<br />1.1 GENERAL
<br />SECTION 01541
<br />PROTECTION OF THE WORK AND PROPERTY
<br />• A. CONTRACTOR shall be responsible for taking all precautions, providing all
<br />programs, and taking all actions necessary to protect the Work and all public and
<br />private property and facilities from damage as specified in the General Condi-
<br />tions and herein.
<br />B. In
<br />order to prevent damage, injury or loss, CONTRACTOR'S actions shall
<br />include, but not be limited to, the following:
<br />1.
<br />Store apparatus, materials, supplies, and equipment in an orderly, safe
<br />manner that will not unduly interfere with the progress of the Work or the
<br />Work of any other Contractor or utility service company.
<br />2.
<br />Provide suitable storage facilities for all materials, which are subject to injury
<br />by exposure to weather, theft, breakage, or otherwise.
<br />` 3.
<br />Place upon the Work or any part thereof, only such loads as are consistent
<br />with the safety of that portion of the Work.
<br />4.
<br />Clean up frequently all refuse, rubbish, scrap materials, and debris caused
<br />`
<br />by construction operations, so that at all times, the site of the Work presents
<br />a safe, orderly, and workmanlike appearance.
<br />5.
<br />Provide barricades and guard rails around openings, for scaffolding, for
<br />`
<br />temporary stairs and ramps, around excavations, elevated walkways and
<br />other hazardous areas.
<br />C. Except after written consent from proper parties, do not enter or occupy
<br />privately -owned land with men, tools, materials or equipment, except on
<br />easements provided herein.
<br />D. Assume full responsibility for the preservation of all public and private property or
<br />facility on or adjacent to the site. If any direct or indirect damage is done by or
<br />on account of any act, omission, neglect or misconduct in the execution of the
<br />Work by the CONTRACTOR, it shall be restored by the CONTRACTOR, at its
<br />�. expense, to a condition equal to or better than that existing before the damage
<br />was done.
<br />M 1.2 BARRICADES AND WARNING SIGNALS
<br />Where Work is performed on or adjacent to any roadway, right-of-way, or public
<br />r place, provide barricades, fences, lights, warning signs, danger signals, and
<br />watchmen, and take other precautionary measures for the protection of persons or
<br />property and of the Work. Paint barricades so they are visible at night. From sunset
<br />to sunrise, furnish and maintain at least one light at each barricade. Erect sufficient
<br />barricades to keep vehicles from being driven on or into Work under construction.
<br />Furnish watchmen in sufficient numbers to protect the Work. CONTRACTOR's
<br />r responsibility for the maintenance of barricades, signs, lights, and for providing
<br />watchmen shall continue until OWNER accepts the Project.
<br />01541-1 F1Engineering\Capital Projects\9611-CR 512 WdeningV9611
<br />+ CR 512 PHASE IV\Contract Documents\01541 - Protection of Property.doc
<br />
|