My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:12:15 AM
Creation date
9/30/2015 11:52:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (3)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting Specifications and Contract
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> • 1 . 3 TREE AND PLANT PROTECTION <br /> A. Protect existing trees , shrubs and plants on or adjacent to the site that are shown <br /> • or designated to remain in place against unnecessary cutting , breaking or <br /> skinning of trunk , branches , bark or roots. <br /> • B . Do not store or park materials or equipment within the drip line . <br /> C . Install temporary fences or barricades to protect trees and plants in areas subject <br /> to traffic. <br /> D . Fires shall not be permitted under or adjacent to trees and plants . <br /> • <br /> E . Within the limits of the Work , water trees and plants that are to remain , in order <br /> to maintain their health during construction operations . <br /> F . Cover all exposed roots with burlap and keep it continuously wet. Cover all <br /> exposed roots with earth as soon as possible . Protect root systems from <br /> • mechanical damage and damage by erosion , flooding , run-off or noxious <br /> materials in solution . <br /> • G . If branches or trunks are damaged , prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> • <br /> horticultural use . <br /> H . Remove all damaged trees and plants that die or suffer permanent injury and <br /> r, replace them with a specimen of equal or better quality. <br /> I . Coordinate Work in this Section with requirements of other sections herein . <br /> • <br /> 1 .4 PROTECTION OF IRRIGATION <br /> • The CONTRACTOR shall be responsible for maintaining in good condition all <br /> irrigation systems within the easements , which could be damaged by <br /> construction activities. The CONTRACTOR shall repair any irrigation systems <br /> ., damaged by construction activities within two (2) days . Irrigation systems <br /> partially within the right-of-way of Kings Highway and all intersecting side streets <br /> within project limits may be cut off and capped or connected to same system to <br /> • maintain functionality . The CONTRACTOR shall be responsible for maintaining <br /> the functionality of the remaining portion of the system if it should fall outside of <br /> the right-of-way. <br /> • <br /> • <br /> 1 . 5 PROTECTION OF EXISTING STRUCTURES <br /> 01541 -2 F9EngineedngZapital Projects19611-CR512 Widening49611 <br /> CR 512 PHASE IVtContract DocumentsW1541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.