Laserfiche WebLink
r <br /> SECTION 102 <br /> MAINTENANCE OF TRAFFIC <br /> A. General: Work under this section consists of maintaining traffic within the limits of the <br /> project for the duration of construction in accordance with the U . S . Department of <br /> Transportation' s Manual on Uniform Traffic Control Devices (MUTCD) 2003 Edition , FDOT <br /> Index 600 Series and FDOT Standard Specification Section 102 . The purpose of the Traffic <br /> r Control Plan , presented in the roadway construction plans, is to depict the concept of <br /> feasible construction sequencing and maintenance of traffic. The Contractor may submit to <br /> the Engineer an alternate plan for review and approval , one week prior to the pre- <br /> construction conference . The Traffic Control Plan indicates typical signing , marking and <br /> barricade locations and types. Additional details are found in the MUTCD, FDOT Index <br /> (600 Series) and Standard Specifications. The Contractor shall install only new TCP signs <br /> and shall be Engineer quality. <br /> B . Quantities: The Contractor is hereby notified that the Engineer's estimate of quantities, <br /> which appears on the summary of quantities sheet, is provided only for the Contractor's <br /> information . The Contractor is to determine the actual quantities and items to be used for <br /> maintenance of traffic. <br /> s C . Off-duty police or sheriff deputies shall be used during various maintenance of traffic <br /> operations including : signalization adjustments and installations and lane closures of <br /> duration greater than 10 minutes. <br /> D . Compensation : All compensation for maintenance of traffic includes: barricades (Type ll ), <br /> Barricades (Type III ), Temporary Pavement along CR 512 and variable message sign , shall <br /> r be lump sum . This shall include all items and services necessary for the safe maintenance <br /> of traffic within the project limits. This shall include, but not be limited to, flaggers, off-duty <br /> police or sheriff deputy, construction and advisory signing , detours , temporary retaining <br /> r systems, striping , maintenance of pavement, asphaltic concrete curb, temporary barrier <br /> wall , stormwater removal , temporary drainage structures and pipe, pumps, commercial <br /> material for driveway maintenance, flashing arrow boards , high intensity flashing lights , <br /> removable and temporary pavement markings, and temporary reflective pavement markers, <br /> temporary pavement, for maintenance of traffic. <br /> Item No. 102- 1 - Maintenance of Traffic — Lump Sum <br /> E . Non-Compliance: Should the Owner or Engineer determine that traffic within the project is <br /> not being maintained in accordance with the approved traffic control plan or presents a <br /> public safety concern , the Contractor shall have until the end of the working day, in which <br /> notification is given , to take action to modify the maintenance of traffic. Should the <br /> Contractor fail to make such modification the Owner shall have the option to fine the <br /> â€Ēr Contractor $450 per day until remedied . <br /> r <br /> s <br /> r <br />