Laserfiche WebLink
r. <br /> SECTION 104 <br /> r EROSION AND WATER POLLUTION CONTROL <br /> The Contractor shall install erosion and water pollution methods in accordance with FDOT Index <br /> Wo 1003 102 , 103 and 104 , Standard Specifications Section 104, and all permit requirements . The <br /> Contractor is responsible for meeting appropriate federal , state, and local regulations and water <br /> quality standards, such as turbidity. All disturbed areas will be replanted with approved <br /> 1W vegetation cover (either final or temporary) within 30 days of final grading . <br /> A. NPDES Permit: Contractor is responsible for preparing , submitting and obtaining the <br /> r NPDES Permit. Erosion Control Plans included in the construction plans are for suggestive <br /> purposes only and are not considered to be a complete Erosion Control Plan . Contractor is <br /> responsible for any preparing any additional plans/information that will be required in order <br /> r, to obtain the NPDES Permit. <br /> B . Pre-construction Conference: At the pre-construction conference the Contractor shall <br /> present, in written form , his plans and schedules for prevention , control , and abatement of <br /> erosion and water pollution . <br /> C. Ditches. Streams and Canals: Staked and floating turbidity barriers shall be installed in all <br /> permanent water courses in a manner so as not to act as a dam . Barriers shall be located <br /> at distances of no greater than 25' downstream from the last point of construction . <br /> D . Silt Fences: Silt fences shall be installed to prevent silt and erosion from leaving the <br /> project limits particularly adjacent to wetlands , roadside ditches or existing bodies of water. <br /> E. Storm Sewer System : The Contractor shall protect the storm sewer system from erosion <br /> and sedimentation during construction . This may include the use of baled hay, silt fences <br /> or any other method approved by the Engineer. Should any constructed item be damaged <br /> r due to erosion or sedimentation , the Contractor shall repair or replace the item with no <br /> additional compensation . All new and existing (where called for) storm sewer pipes shall <br /> be clean and free from silt prior to final acceptance. <br /> r <br /> F . Mowing : Mowing shall be based upon a minimum of one ( 1 ) cutting per month for mowing <br /> within right-of-way, including all ditches and side streets within limits of construction . <br /> s <br /> G . Compensation : All payment for the above items shall be made under Item <br /> _ Item No . 104-4 Mowing Per Acre <br /> Item No . 104- 10 Baled Hay or Straw Per Each <br /> Item No. 104- 13 Silt Fence (Type lll ) Per Linear Foot <br /> rr <br /> r <br /> r <br /> r <br />