Laserfiche WebLink
No <br />SECTION 104 <br />r EROSION AND WATER POLLUTION CONTROL <br />The Contractor shall install erosion and water pollution methods in accordance with FDOT Index <br />Wo 1003 102, 103 and 104, Standard Specifications Section 104, and all permit requirements. The <br />Contractor is responsible for meeting appropriate federal, state, and local regulations and water <br />quality standards, such as turbidity. All disturbed areas will be replanted with approved <br />1W vegetation cover (either final or temporary) within 30 days of final grading. <br />A. NPDES Permit: Contractor is responsible for preparing, submitting and obtaining the <br />r NPDES Permit. Erosion Control Plans included in the construction plans are for suggestive <br />purposes only and are not considered to be a complete Erosion Control Plan. Contractor is <br />responsible for any preparing any additional plans/information that will be required in order <br />to to obtain the NPDES Permit. <br />B. Pre -construction Conference: At the pre -construction conference the Contractor shall <br />present, in written form, his plans and schedules for prevention, control, and abatement of <br />erosion and water pollution. <br />C. Ditches. Streams and Canals: Staked and floating turbidity barriers shall be installed in all <br />permanent water courses in a manner so as not to act as a dam. Barriers shall be located <br />at distances of no greater than 25' downstream from the last point of construction. <br />D. Silt Fences: Silt fences shall be installed to prevent silt and erosion from leaving the <br />project limits particularly adjacent to wetlands, roadside ditches or existing bodies of water. <br />E. Storm Sewer System: The Contractor shall protect the storm sewer system from erosion <br />and sedimentation during construction. This may include the use of baled hay, silt fences <br />or any other method approved by the Engineer. Should any constructed item be damaged <br />r due to erosion or sedimentation, the Contractor shall repair or replace the item with no <br />additional compensation. All new and existing (where called for) storm sewer pipes shall <br />be clean and free from silt prior to final acceptance. <br />r <br />F. Mowing: Mowing shall be based upon a minimum of one (1) cutting per month for mowing <br />within right-of-way, including all ditches and side streets within limits of construction. <br />s <br />G. Compensation: All payment for the above items shall be made under Item <br />_ Item No. 104-4 Mowing Per Acre <br />Item No. 104-10 Baled Hay or Straw Per Each <br />Item No. 104-13 Silt Fence (Type III) Per Linear Foot <br />rr <br />71 <br />W <br />W <br />