My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:12:15 AM
Creation date
9/30/2015 11:52:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (3)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting Specifications and Contract
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. <br /> SECTION 104 <br /> r EROSION AND WATER POLLUTION CONTROL <br /> The Contractor shall install erosion and water pollution methods in accordance with FDOT Index <br /> Wo 1003 102 , 103 and 104 , Standard Specifications Section 104, and all permit requirements . The <br /> Contractor is responsible for meeting appropriate federal , state, and local regulations and water <br /> quality standards, such as turbidity. All disturbed areas will be replanted with approved <br /> 1W vegetation cover (either final or temporary) within 30 days of final grading . <br /> A. NPDES Permit: Contractor is responsible for preparing , submitting and obtaining the <br /> r NPDES Permit. Erosion Control Plans included in the construction plans are for suggestive <br /> purposes only and are not considered to be a complete Erosion Control Plan . Contractor is <br /> responsible for any preparing any additional plans/information that will be required in order <br /> r, to obtain the NPDES Permit. <br /> B . Pre-construction Conference: At the pre-construction conference the Contractor shall <br /> present, in written form , his plans and schedules for prevention , control , and abatement of <br /> erosion and water pollution . <br /> C. Ditches. Streams and Canals: Staked and floating turbidity barriers shall be installed in all <br /> permanent water courses in a manner so as not to act as a dam . Barriers shall be located <br /> at distances of no greater than 25' downstream from the last point of construction . <br /> D . Silt Fences: Silt fences shall be installed to prevent silt and erosion from leaving the <br /> project limits particularly adjacent to wetlands , roadside ditches or existing bodies of water. <br /> E. Storm Sewer System : The Contractor shall protect the storm sewer system from erosion <br /> and sedimentation during construction . This may include the use of baled hay, silt fences <br /> or any other method approved by the Engineer. Should any constructed item be damaged <br /> r due to erosion or sedimentation , the Contractor shall repair or replace the item with no <br /> additional compensation . All new and existing (where called for) storm sewer pipes shall <br /> be clean and free from silt prior to final acceptance. <br /> r <br /> F . Mowing : Mowing shall be based upon a minimum of one ( 1 ) cutting per month for mowing <br /> within right-of-way, including all ditches and side streets within limits of construction . <br /> s <br /> G . Compensation : All payment for the above items shall be made under Item <br /> _ Item No . 104-4 Mowing Per Acre <br /> Item No . 104- 10 Baled Hay or Straw Per Each <br /> Item No. 104- 13 Silt Fence (Type lll ) Per Linear Foot <br /> rr <br /> r <br /> r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.