Laserfiche WebLink
r <br /> w <br /> SECTION 109 <br /> FIELD OFFICE <br /> The Specifications for Field Office (Contractor) shall include furnishing and installing a <br /> Construction Field Office at or near the Project Limits in accordance with these Specifications . <br /> +� The Contractor shall provide and maintain , in good condition , for the exclusive use of the <br /> Engineer, one or more of the hereinafter described construction field offices at a location or <br /> locations to be approved by the Engineer. <br /> r <br /> The office shall be of weatherproof construction having a floor space of no less than 228 SF , <br /> located on or in the immediate vicinity of the Project. The office shall be provided with sufficient <br /> natural and artificial light and shall be adequately cooled and/or heated . Doors and windows <br /> shall be equipped with adequate locks, and all keys shall be in the possession of the Engineer. <br /> Suitable sanitary conveniences for the use of the Engineer, shall be provided in or adjoining the <br /> field office or offices which shall be maintained clean and in good working condition , and shall <br /> ' be stocked with lavatory and sanitary supplies at all times during the period of the Contract. <br /> The office shall be equipped with tables and chairs for the use of four (4) people and shall have <br /> sufficient drawers for the standard size plans , either attached to the tables or in cabinet form , <br /> one ( 1 ) rough plan rack, one ( 1 ) supply cabinet, a minimum of five (5 ) gallons of potable water <br /> maintained by the Contractor, one ( 1 ) dual cassette telephone answering machine, one ( 1 ) fax <br /> machine , and one ( 1 ) fire-resistant (2) drawer legal size file cabinet meeting fire underwriters' <br /> approval for no less than a 1 -hour test. The room also shall be provided with a desk and chair. <br /> Parking spaces for two (2) full-size vehicles shall also be provided within the immediate vicinity <br /> of the office. <br /> The Contractor will provide for the installation of telephone facilities in the field offices. <br /> However, only the minimum monthly service charge and work related toll charges will be paid by <br /> the Contractor. <br /> In lieu of the field office or offices specified above , the Contractor may provide equivalent office <br /> space, equipment and facilities subject to approval of the Engineer. <br /> The field office shall be ready for use later than ten ( 10) calendar days after the date of mailing <br /> the fully executed Contract and before any other work is started , and shall be maintained by the <br /> r' Contractor until one ( 1 ) month after final acceptance of the Project by the Engineer and Owner, <br /> and then shall be removed . <br /> �+ Item of Payment <br /> Payment shall be made under: <br /> rr <br /> Item No . 109-71 Field Office (Contractor) (Lump Sum ) <br /> r <br />