Laserfiche WebLink
M <br />to <br />FIELD OFFICE <br />SECTION 109 <br />W Item of Payment <br />Payment shall be made under: <br />rr <br />Item No. 109-71 Field Office (Contractor) (Lump Sum) <br />.a <br />The Specifications for Field Office (Contractor) shall include furnishing and installing a <br />Construction Field Office at or near the Project Limits in accordance with these Specifications. <br />+� <br />The Contractor shall provide and maintain, in good condition, for the exclusive use of the <br />Engineer, one or more of the hereinafter described construction field offices at a location or <br />locations to be approved by the Engineer. <br />r <br />The office shall be of weatherproof construction having a floor space of no less than 228 SF, <br />located on or in the immediate vicinity of the Project. The office shall be provided with sufficient <br />natural and artificial light and shall be adequately cooled and/or heated. Doors and windows <br />shall be equipped with adequate locks, and all keys shall be in the possession of the Engineer. <br />Suitable sanitary conveniences for the use of the Engineer, shall be provided in or adjoining the <br />field office or offices which shall be maintained clean and in good working condition, and shall <br />' <br />be stocked with lavatory and sanitary supplies at all times during the period of the Contract. <br />The office shall be equipped with tables and chairs for the use of four (4) people and shall have <br />sufficient drawers for the standard size plans, either attached to the tables or in cabinet form, <br />one (1) rough plan rack, one (1) supply cabinet, a minimum of five (5) gallons of potable water <br />maintained by the Contractor, one (1) dual cassette telephone answering machine, one (1) fax <br />machine, and one (1) fire-resistant (2) drawer legal size file cabinet meeting fire underwriters' <br />approval for no less than a 1 -hour test. The room also shall be provided with a desk and chair. <br />Parking spaces for two (2) full-size vehicles shall also be provided within the immediate vicinity <br />of the office. <br />The Contractor will provide for the installation of telephone facilities in the field offices. <br />However, only the minimum monthly service charge and work related toll charges will be paid by <br />the Contractor. <br />In lieu of the field office or offices specified above, the Contractor may provide equivalent office <br />space, equipment and facilities subject to approval of the Engineer. <br />The field office shall be ready for use later than ten (10) calendar days after the date of mailing <br />the fully executed Contract and before any other work is started, and shall be maintained by the <br />r' <br />Contractor until one (1) month after final acceptance of the Project by the Engineer and Owner, <br />and then shall be removed. <br />W Item of Payment <br />Payment shall be made under: <br />rr <br />Item No. 109-71 Field Office (Contractor) (Lump Sum) <br />.a <br />