My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:12:15 AM
Creation date
9/30/2015 11:52:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (3)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting Specifications and Contract
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aw <br /> _ SECTION 110 <br /> CLEARING AND GRUBBING <br /> A. Payment for Clearing and Grubbing shall include compensation for: the removal and <br /> disposal of asphaltic (existing flexible pavement, excluding existing public roadways which <br /> is paid for under Pay Item 110-4) and existing concrete pavement, concrete, sidewalks, <br /> curbing , abandoned utilities (including pipes , cables, conduit and structures), existing walls, <br /> riprap, various types of fences, septic tanks , drain fields, pump stations, motor boxes, <br /> pumps, irrigation apparatus, base material , trimming of trees and shrubs, drainage <br /> r structures, pipe , backfilling the removal excavations, plus all other items necessary to be <br /> removed to construct the project. All non-salvageable materials removed shall remain <br /> property of the Contractor unless otherwise directed by the Engineer or Owner. All <br /> unwanted materials shall be removed and suitably disposed of by the Contractor outside <br /> the project limits. Any salvage value received from the removed materials shall be <br /> reflected in the Contractor's proposal . <br /> B . Existing and temporary asphaltic pavement and excess subsoil shall be disposed of outside <br /> the project by the Contractor, at a location and in a manner approved by the Engineer. <br /> C. Removal of existing pavement includes all removal and disposal of the asphalt within the <br /> limit shown on the plans for CR 512 and the intersecting side streets. A 3" layer of topsoil <br /> is include in this work for the removed asphalt along CR 512 and paid for in this item . <br /> • <br /> D . Existing artesian and non-artesian water wells located within the limits of the proposed <br /> roadway improvements shall be grouted and sealed in accordance with St. Johns River <br /> r Water Management District Chapter 40C-3, F . A. C . <br /> Payment shall be made under: <br /> r <br /> Item No. 110- 1 -1 Clearing and Grubbing Lump Sum <br /> r <br /> r <br /> r <br /> w <br />
The URL can be used to link to this page
Your browser does not support the video tag.