r <br /> SECTION 120 <br /> r <br /> EXCAVATION AND EMBANKMENT <br /> A. Earthwork , including earthwork for drives and retention ponds outside the right-of-way <br /> limits , shall be paid for as regular excavation . Any excavation to the proposed bottom <br /> elevation of the select fill shall be paid for as regular excavation . Cost shall include all work <br /> specified in this Section and Section 120 of the Standard Specifications. The quantity of <br /> regular excavation is provided due to the evaluation that excavated material will not meet <br /> the specifications for roadway embankment. Any excavated material that does not meet <br /> r the specifications for roadway embankment shall be disposed of by the Contractor with no <br /> additional compensation . Such price and payment shall specifically include all cost of any <br /> roadway, lateral ditch or canal , and final dressing operations in accordance with Section <br /> 4W 120-13 . 3 . <br /> B. Earthwork quantities shall be considered as in-place material with no shrinkage or <br /> r expansion factors . <br /> C. Subsoil Excavation — Any excavation below the proposed bottom elevation of the select fill , <br /> isolated swale bottom locations, isolated locations for pipe installations, and as approved by <br /> r the Engineer, shall be paid for as subsoil excavation . Approximately 2 . 5 ft of subsoil <br /> excavation is required in sublateral canals and ditches located under proposed roadway <br /> and drainage culvert improvements. Cost of replacement embankment shall be included in <br /> r cost of subsoil excavation. Contractor to coordinate with County representative prior to any <br /> subsoil excavation . <br /> .. D . Embankment: General Requirements for Embankment Materials: <br /> Roadway Design Standard Index No . 505 , Embankment Utilization Details is modified by <br /> the addition of the following : <br /> Embankment Select Material (A- 1 , A-3 , A-2-4) shall not contain more than 12% passing the <br /> • <br /> U . S . No. 200 sieve . <br /> Fill materials shall be placed at or slightly dry of their optimum moisture content for <br /> compaction as determined by AASHTO T-180 . Fill soils will be dried prior to placement in <br /> " the embankment. <br /> Any stratum or stockpile or soil which contains obvious pockets of highly organic material <br /> • may be designated as muck or unsuitable for construction of subgrade by the Owner. <br /> Backfill material containing more than 2 . 0% by weight of organic material , as determined by <br /> �. FM 1 -T267 and by averaging the test results for three randomly selected samples from <br /> each stratum or stockpile of a particular material , shall not be used in construction of the <br /> reinforced volume. If an individual test value of the three samples exceeds 3.0% , the <br /> 1, stratum or stockpile will not be suitable for construction of the reinforced volume . <br /> a <br />