My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:12:15 AM
Creation date
9/30/2015 11:52:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (3)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting Specifications and Contract
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AW <br /> r <br /> No A-8 material permitted in embankment either inside or outside of sidewalk location . <br /> r Payment shall be made under: <br /> Item No . 120-1 Regular Excavation Per Cubic Yard <br /> Item No. 120-4 Subsoil Excavation Per Cubic Yard <br /> Item No. 120-6 Embankment Per Cubic Yard <br /> r <br /> SECTION 160 <br /> r <br /> STABILIZING <br /> Sub Article 160-3 is modified by the addition of the following : <br /> "The stabilization thickness indicated on plans shall be considered a minimum thickness. <br /> r Thickness will vary to conform to the lines, and grades shown in the plans." Minimum L. B . R. _ <br /> 40 — No under-tolerance. <br /> _ Payment shall be made under: <br /> Item No . 160-4- 1 Type B Stabilization ( 12") Per Square Yard <br /> Item No. 160-4-2 Type B Stabilization (8") Per Square Yard <br /> w <br /> SECTION 285 <br /> • <br /> OPTIONAL BASE COURSE <br /> ., Sub Article 285-4 is modified by the addition of the following : <br /> A. Base material , thickness and requirements are described in the construction plans. Only <br /> one type of alternate base material shall be used through the project limits . The soil <br /> cement option will not be permitted . <br /> r <br /> Item of Payment <br /> Payment shall be made under: <br /> "' Item No. 285-7-09 Base Group 9 Per Square Yard <br /> Item No . 285-7- 16 Base Group 16 Per Square Yard <br /> r <br /> r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.