Laserfiche WebLink
ow <br /> SECTION 286 <br /> TURNOUT CONSTRUCTION <br /> Specifications for turnout construction shall conform to the applicable portions of Section 286 of <br /> the Florida Department of Transportation Standard Specifications for Road and Bridge <br /> Construction (2007 Edition) . <br /> • Item of Payment <br /> Payment shall be made under: <br /> r <br /> Item No. 286- 1 - 1 Turnout Construction Asphalt Per Square Yard <br /> SECTION 300 <br /> PRIME AND TACK COATS <br /> All prime and tack materials as identified in the 2007 FDOT Road and Bridge Specifications may <br /> be used . Article 300-9 Basis of Payment is deleted and the following substituted : The <br /> quantities to be paid for under this Section shall be included in the cost of the following contract <br /> items : <br /> A. Prime Coat — included in 'Base" Pay Item <br /> B. Tack Coat — included in "Superpave Asphaltic Concrete" Pay Item <br /> C . Bituminous Material ( Plant Mix) (asph. cem . 20/30) — to be included in Superpave <br /> Asphaltic Concrete. <br /> 4W <br /> SECTION 327 <br /> MILLING EXISTING ASPHALT PAVING <br /> Item of Payment: <br /> r <br /> Payment shall be made under: <br /> r Item No . 327-70-1 Milling Existing Asphalt Paving Per Square Yard <br /> Item No . 327-73 Milling & Resurfacing (1 " depth , <br /> Type SP9 . 5 , Level C) Per Square Yard <br /> r <br /> 40 <br />