Laserfiche WebLink
771 <br />W <br />SECTION 286 <br />TURNOUT CONSTRUCTION <br />Specifications for turnout construction shall conform to the applicable portions of Section 286 of <br />the Florida Department of Transportation Standard Specifications for Road and Bridge <br />Construction (2007 Edition). <br />• Item of Payment <br />aj <br />r <br />Payment shall be made under: <br />Item No. 286-1-1 Turnout Construction Asphalt Per Square Yard <br />SECTION 300 <br />PRIME AND TACK COATS <br />All prime and tack materials as identified in the 2007 FDOT Road and Bridge Specifications may <br />be used. Article 300-9 Basis of Payment is deleted and the following substituted: The <br />quantities to be paid for under this Section shall be included in the cost of the following contract <br />items: <br />A. Prime Coat — included in 'Base" Pay Item <br />B. Tack Coat — included in "Superpave Asphaltic Concrete" Pay Item <br />C. Bituminous Material (Plant Mix) (asph. cem. 20/30) — to be included in Superpave <br />Asphaltic Concrete. <br />4W <br />SECTION 327 <br />'W MILLING EXISTING ASPHALT PAVING <br />• <br />Item of Payment: <br />Payment shall be made under: <br />*m Item No. 327-70-1 <br />Item No. 327-73 <br />W <br />El <br />W <br />40 <br />Milling Existing Asphalt Paving Per Square Yard <br />Milling & Resurfacing (1" depth, <br />Type SP9.5, Level C) Per Square Yard <br />