LJ <br />r <br />E. Water for Grassing: Contractor shall provide the water used in the sodding operations as <br />necessary to meet the requirements of Article 570-3. <br />r <br />F. Preparation of Ground: The area over which the sod is to be placed shall be scarified or <br />loosened to a depth and then raked smooth and free from debris. Where the soil is <br />` <br />sufficiently loose and clean, the Owner, at his discretion, may authorize the elimination of <br />ground preparation. <br />• <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a range of <br />6.0-7.0. <br />r <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and the second <br />application shall be "weed and feed." <br />r <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds per <br />acre, or 10 pounds per 1,000 square feet, by a spreading device capable of uniformly <br />distributing the material at the specified rate. <br />Contractor shall apply applications a per manufacturer's specification. All tickets from bags <br />shall be handed over to the County Inspector. <br />` <br />On steep slopes, where the use of a machine for spreading or mixing is not practicable, the <br />fertilizer shall be spread by hand and raked in and thoroughly mixed with the soil to a depth <br />of approximately 2 inches. <br />r <br />H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close contact <br />and shall be firmly and smoothly embedded by light tamping with appropriate tools. <br />r <br />Where sodding is used in drainage ditches, the setting of the pieces shall be staggered so <br />as to avoid a continuous seam along the line of flow. Along the edges of such staggered <br />areas, the offsets of individual strips shall not exceed 6 inches. In order to prevent erosion <br />caused by vertical edges at the outer limits, the outer pieces of sod shall be tamped so as <br />to produce a feathered edge effect. <br />s <br />Where sodding is placed abutting paved shoulder, the Contractor is to ensure that the <br />finished sod elevation is 1-1/2" below paved shoulder. <br />` <br />On slopes greater than 3:1, the Contractor shall prevent the sod from sliding by means of <br />wooden pegs driven through the sod blocks into firm earth, at suitable intervals. <br />r' <br />Sodding shall not be performed when weather and soil conditions are, in the Engineer's <br />opinion, unsuitable for proper results. <br />■► <br />I. Watering: The areas on which the sod is to be placed shall contain sufficient moisture, as <br />determined by the Engineer, for optimum results. After being placed, the sod shall be kept <br />in a moist condition to the full depth of the rooting zone for at least two (2) weeks. <br />a <br />Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br />grow for a minimum of 60 days (or until final acceptance, whichever is latest). <br />M <br />