My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:12:15 AM
Creation date
9/30/2015 11:52:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (3)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting Specifications and Contract
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> " SECTION 01009 <br /> SPECIAL PROVISIONS <br /> r <br /> 1 . 1 GENERAL <br /> A. Visits to the construction site may be made by representatives of permitting or <br /> governing bodies . Submit details of all instructions from the above to the ENGINEER <br /> immediately. The Work will not be accepted by the OWNER until final acceptance has <br /> been received from the various Regulatory Agencies having jurisdiction . <br /> B . Furnish sufficient labor, construction equipment and materials, and work such hours , <br /> including night shifts and overtime operations , as may be necessary to insure the <br /> prosecution of the work in accordance with the approved progress schedule. If, in the <br /> r opinion of the ENGINEER , the CONTRACTOR falls behind the progress schedule , take <br /> such steps as may be necessary to improve progress, all without additional cost to the <br /> OWNER . The ENGINEER shall be compensated for his overtime services in <br /> r accordance with the Supplementary Conditions , SC-6. 02 . <br /> C . All salvageable material and equipment for which specific use, relocation or other <br /> r disposal is not specifically noted , shall remain the property of the OWNER and shall be <br /> delivered to the OWNER at the following location : 4550 41St Street , at the <br /> CONTRACTOR's expense . All material and equipment not in salvageable condition , as <br /> .. determined by the ENGINEER and the OWNER, shall be disposed of by the <br /> CONTRACTOR , at the CONTRACTOR's expense . <br /> +■ D . In addition to these Specifications all work must comply with the requirements of the <br /> local governing agency, St. Johns River Water Management District, Department of <br /> Environmental Protection , Corps of Engineers , Indian River Farms Water Control <br /> District, and all other applicable State or Federal agencies' specifications and permits . <br /> In the event of a conflict, the more stringent specification or requirement shall govern . <br /> r E. Before performing any work outside the designated limits of the work site , secure any <br /> necessary permits and authorization from the applicable owner, or verify in writing that <br /> such has been previously obtained . Follow all requirements of any said permits or <br /> • authorization . Give the ENGINEER and appropriate owner ten ( 10 ) days minimum <br /> notice before commencing construction operations outside the designated limits of the <br /> work site . Adjacent property owners at time of bidding are listed below. <br /> r <br /> r <br /> r <br /> 01009-1 01009-Special Provisions <br /> i F:\Engineering\Capital Projects\9611 -CR 512 Widening\9611 CR 512 PHASE IV\Contract Documents\01009 - Special Provisions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.