Laserfiche WebLink
M SECTION 01024 <br />r FORCE ACCOUNT <br />1.1 General <br />CONTRACTOR shall furnish all labor, materials, equipment and incidentals <br />r necessary to perform additional work not covered on the Contract Drawings. <br />The force Account is intended as a contingency for unforeseen work. <br />r 1.1 PAYMENT <br />A. Lump sum amount for force account work is included in the bid schedule. <br />.. The value of force account work will be determined in accordance with Article <br />12 of the General Conditions. <br />M <br />M <br />M <br />• <br />M <br />1 <br />+ + END OF SECTION + + <br />01024- 1 <br />F:\Engineering\Capital Projects\9611-CR 512 Widening\9611 CR 512 PHASE MContract Documents\01024 - Force Account.doc <br />