My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:12:15 AM
Creation date
9/30/2015 11:52:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (3)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting Specifications and Contract
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conduit, fiberglass reinforced epoxy conduit, rigid galvanized conduit, rigid aluminum conduit or <br /> PVC coated intermediate metal conduit above ground. <br /> Use the same PVC coating for the metal straps as the conduit, when using PVC <br /> coated intermediate metal conduit. <br /> 630-3 .10 Elbows : Use only preformed or field constructed conduit elbows. The radius of <br /> curvature of the inner edge of any bend shall not be less than shown below: <br /> r <br /> Size Standard Radius <br /> 1 /2 inch 4 inches <br /> 3/4 inch 4 1 /2 inches <br /> 1 inch 5 1/2 inches <br /> 1 1 /4 inches 7 1/4 inches <br /> 1 1/2 inches 8 1 /4 inches <br /> 2 inches 9 1 /2 inches <br /> r 2 1 /2 inches 10 1 /2 inches <br /> 3 inches 13 inches <br /> 3 1 /2 inches 15 inches <br /> 4 inches 16 inches <br /> 5 inches 24 inches <br /> •r <br /> 6 inches 30 inches <br /> 630-4 Method of Measurement. <br /> 630-4 .1 General: Measurement for payment will be in accordance with the following <br /> work tasks. <br /> 630-4.2 Furnish and Install: The Contract unit price per foot of conduit, furnished and <br /> installed, will include famishing all hardware and materials as specified in the Contract <br /> Documents, and all labor, trenching, backfilling, and restoration materials necessary for a <br /> complete and accepted installation. <br /> OW Payment for conduit placed in the ground or used on bridge decks will be based <br /> on the horizontal path of the installed conduit as measured in a straight line between the centers <br /> of pull boxes, cabinets, poles, etc. No allowance will be made for sweeps or vertical distances <br /> y above or below the ground or the bridge deck. <br /> Due to conditions which may exist on the project site, the Contractor may furnish <br /> conduit in variable lengths . <br /> • Furnishing and installing the locate wire is included in the cost of the conduit. <br /> Conduit used for fiber optic cable includes the cost of furnishing and installing <br /> the locate wire and the cost of conducting the continuity test and the insulation resistance test. <br /> • 6304.3 Furnish: The Contract unit price per foot of Conduit, furnished, will include the <br /> cost of materials, and hardware as specified in the Contract Documents, plus all shipping and <br /> handling cost involved in delivery as specified in the Contract Documents. <br /> r' The Contractor shall furnish conduit in 20 foot sections with one coupling per <br /> section. <br /> 630-4.4 Install: The Contract unit price per foot of conduit, installed, will include all <br /> miscellaneous hardware and materials, labor, trenching, backfilling, and restoration materials <br /> necessary for a complete and accepted installation. <br /> r <br /> w <br />
The URL can be used to link to this page
Your browser does not support the video tag.