Laserfiche WebLink
The Engineer will supply conduit in sections with one coupling per section and <br /> elbows as required. <br /> Payment for conduit placed in the ground or used on bridge decks will be based <br /> on the horizontal path of the installed conduit as measured in a straight line between the centers <br /> of pull boxes, cabinets, poles, etc. No allowance will be made for sweeps or vertical distances <br /> above or below the ground or the bridge deck. <br /> Installing the locate wire is included in the cost of the conduit. Conduit used for <br /> fiber optic cable includes the cost of installing the locate wire and the cost of conducting the <br /> w, continuity test and the insulation resistance test. <br /> 630-5 Basis of Payment. <br /> Price and payment will be full compensation for all work specified in this Section. <br /> Payment will be made under: <br /> Item No. 630- 1 -2 Conduit - per foot. <br /> w <br /> • <br /> rr <br /> • <br /> •r <br /> r <br /> • <br /> w <br /> i <br /> r <br /> w <br /> r. <br />