Laserfiche WebLink
W <br />r7 <br />The Engineer will supply conduit in sections with one coupling per section and <br />elbows as required. <br />Payment for conduit placed in the ground or used on bridge decks will be based <br />on the horizontal path of the installed conduit as measured in a straight line between the centers <br />of pull boxes, cabinets, poles, etc. No allowance will be made for sweeps or vertical distances <br />above or below the ground or the bridge deck. <br />Installing the locate wire is included in the cost of the conduit. Conduit used for <br />fiber optic cable includes the cost of installing the locate wire and the cost of conducting the <br />w, continuity test and the insulation resistance test. <br />630-5 Basis of Payment. <br />Price and payment will be full compensation for all work specified in this Section. <br />Payment will be made under: <br />Item No. 630- 1-2 Conduit - per foot. <br />M <br />• <br />M <br />• <br />n <br />M <br />• <br />on <br />AW <br />M <br />M <br />or <br />r. <br />