My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:18:25 AM
Creation date
9/30/2015 11:53:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (4)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6831
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r CA A 512 <br /> LANDSCAPE SPECIFICATIONS <br /> PART 1 - GENERAL <br /> i . DESCRIPTION OF WORK <br /> A . Work included This section is part of the entire set of contract documents and shall <br /> r. be coordinated with the applicable provisions of the other parts. <br /> B . The extent of the landscape development work is shown on the drawings and in <br /> schedules . Completion of the work shall mean full and exact compliance and <br /> conformity with the provisions expressed or implied in ' the drawings and <br /> specifications.. <br /> The work under this section includes supplying and planting of trees , shrubs and <br /> ground covers in accordance with sound nursery practice and maintaining and <br /> watering them until final completion and acceptance, but not less than 30 days from <br /> s installation, and any other work as called for on the plans and in these <br /> specifications . <br /> 2 . RELATED WORK <br /> A. Site work (rough grading). <br /> • B . Irrigation (see irrigation specifications). <br /> 3 . OUAI= ASSURANCE <br /> r <br /> A. OUALTFICATIONS OF INSTALLERS : The Contractor shall have his labor <br /> crews controlled and directed by a landscape foreman well versed in plant materials, <br /> planting, reading blueprints and coordination between job and nursery , in order to <br /> execute installation rapidly and correctly. <br /> B . TREES AND SHRUBS : Provide trees and shrubs grown in a recognized nursery <br /> r. in accordance with goad horticultural practice. . (The only exception shat be native <br /> Plant <br /> material collected from field Ic lions.} Provide healthy vigorous stock <br /> grown under climatic conditions sinvlar to conditions in the locality of the project <br /> and free of disease, insects, eggs, larvae, and defects such as knots, sun-scald, <br /> injuries, abrasions, or disfigurements . All plant material shall be graded Florida <br /> No . 1 or better as outlined under Grades and Standards for Nursery Plants, State <br /> r <br /> Plant Board of Florida. <br /> 4 . PRODUCT HANDLING <br /> +r A. DELIVERY AND STORAGE: The balls of B & B plants which cannot be planted <br /> immediately on delivery shall be covered with moist soil or mulch or other <br /> protection from drying wind and sun. All plants shall be watered as necessary until <br /> r planted. <br /> B . PROTECTION <br /> 2A - 1 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.