Laserfiche WebLink
i . Trees moved by winch or crane shall be thoroughly protected from chain <br /> marks , girdling, or other bark slippage by means of burlap , wood battens or <br /> other approved method. <br /> • 2 . Container grown plants shall be carefully removed from the container so as not <br /> to disturb the root system. Spade shall not be used to cut containers. <br /> J . JOE CONDMONS <br /> A. EXISTING CONDITIONS <br /> r <br /> 1 . The contractor shall verify all site conditions prior to construction. <br /> 2 . The Contractor shall exercise care in digging and other work so as not to <br /> ' damage existing work including underground pipes and cables , and the pipes <br /> and hydrants of watering systems . Should such overhead or underground <br /> obstructions be encountered which interfere with planting the location of plants <br /> r shall be adjusted to clear such obstruction. <br /> .3 . Should any objectionable materials such as old concrete, bricks, or other debris <br /> be encountered during planting operations, . they shall be removed from the site <br /> by the Contractor. <br /> r <br /> B . SCHEDULING <br /> 1 . In general the work shall proceed as rapidly as the site becomes available. <br /> ar 2 . Landscape installation shall not begin until an adequate source of water is . <br /> available on site. <br /> 3 . The Contractor shall be responsible for coordinating his work with all other <br /> • parties involved with the job in order the eliminate unnecessary complication <br /> during the installation of his work. <br /> w 4 . Upon substantial completion of work, the Contractor shall • request a walk- <br /> through by the Landscape Architect to formulate a "punch list" . Contractor <br /> shall complete "punch list" items as quickly as possible, and request another <br /> walk-through to verify completion. Upon successful completion of the "punch <br /> list" items, the work will be accepted by the Owner. <br /> r <br /> C . The contractor is responsible for his own bathroom and drinking facilities. <br /> 6 . GUARANTEE <br /> A. Considering that the Owner will be responsible for maintaining all materials after <br /> acceptance, the Contractor shall guarantee to replace all plant materials for a period <br /> of time after final acceptance as follows: <br /> r <br /> 1 . Trees (except Palms) - 180 days . <br /> 2 . Palms - 1 year. <br /> 3 . Shrubs and Ground Cover - 60 days. <br /> r <br /> ZA - 2 <br /> r <br />