My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:18:25 AM
Creation date
9/30/2015 11:53:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (4)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6831
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i . Trees moved by winch or crane shall be thoroughly protected from chain <br /> marks , girdling, or other bark slippage by means of burlap , wood battens or <br /> other approved method. <br /> • 2 . Container grown plants shall be carefully removed from the container so as not <br /> to disturb the root system. Spade shall not be used to cut containers. <br /> J . JOE CONDMONS <br /> A. EXISTING CONDITIONS <br /> r <br /> 1 . The contractor shall verify all site conditions prior to construction. <br /> 2 . The Contractor shall exercise care in digging and other work so as not to <br /> ' damage existing work including underground pipes and cables , and the pipes <br /> and hydrants of watering systems . Should such overhead or underground <br /> obstructions be encountered which interfere with planting the location of plants <br /> r shall be adjusted to clear such obstruction. <br /> .3 . Should any objectionable materials such as old concrete, bricks, or other debris <br /> be encountered during planting operations, . they shall be removed from the site <br /> by the Contractor. <br /> r <br /> B . SCHEDULING <br /> 1 . In general the work shall proceed as rapidly as the site becomes available. <br /> ar 2 . Landscape installation shall not begin until an adequate source of water is . <br /> available on site. <br /> 3 . The Contractor shall be responsible for coordinating his work with all other <br /> • parties involved with the job in order the eliminate unnecessary complication <br /> during the installation of his work. <br /> w 4 . Upon substantial completion of work, the Contractor shall • request a walk- <br /> through by the Landscape Architect to formulate a "punch list" . Contractor <br /> shall complete "punch list" items as quickly as possible, and request another <br /> walk-through to verify completion. Upon successful completion of the "punch <br /> list" items, the work will be accepted by the Owner. <br /> r <br /> C . The contractor is responsible for his own bathroom and drinking facilities. <br /> 6 . GUARANTEE <br /> A. Considering that the Owner will be responsible for maintaining all materials after <br /> acceptance, the Contractor shall guarantee to replace all plant materials for a period <br /> of time after final acceptance as follows: <br /> r <br /> 1 . Trees (except Palms) - 180 days . <br /> 2 . Palms - 1 year. <br /> 3 . Shrubs and Ground Cover - 60 days. <br /> r <br /> ZA - 2 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.