Laserfiche WebLink
W <br />I . Trees moved by winch or crane shall be thoroughly protected from chain <br />marks, girdling, or other bark slippage by means of burlap, wood battens or <br />other approved method. <br />• 2. Container grown plants shall be carefully removed from the container so as not <br />to disturb the root system. Spade shall not be used to cut containers. <br />M .. JOE CONDMONS <br />A. EXISTING CONDITIONS <br />r <br />I . The contractor shall verify all site conditions prior to construction. <br />2. The Contractor shall exercise care in digging and other work so as not to <br />' damage existing work including underground pipes and cables, and the pipes <br />and hydrants of watering systems. Should such overhead or underground <br />obstructions be encountered which interfere with planting the location of plants <br />r shall be adjusted to clear such obstruction. <br />.3. Should any objectionable materials such as old concrete, bricks, or other debris <br />be encountered during planting operations,. they shall be removed from the site <br />by the Contractor. <br />r <br />B. SCHEDULING <br />1. In general the work shall proceed as rapidly as the site becomes available. <br />ar 2. Landscape installation shall not begin until an adequate source of water is. <br />available on site. <br />3. The Contractor shall be responsible for coordinating his work with all other <br />• parties involved with the job in order the eliminate unnecessary complication <br />during the installation of his work. <br />w 4. Upon substantial completion of work, the Contractor shall •request a walk- <br />through by the Landscape Architect to formulate a "punch list". Contractor <br />shall complete "punch list" items as quickly as possible, and request another <br />walk-through to verify completion. Upon successful completion of the "punch <br />list" items, the work will be accepted by the Owner. <br />r <br />C. The contractor is responsible for his own bathroom and drinking facilities. <br />6. GUARANTEE <br />A. Considering that the Owner will be responsible for maintaining all materials after <br />acceptance, the Contractor shall guarantee to replace all plant materials for a period <br />of time after final acceptance as follows: <br />r <br />1. Trees (except Palms) - 180 days. <br />is 2. Palms - 1 year. <br />3 . Shrubs and Ground Cover - 60 days. <br />W <br />ZA-2 <br />r <br />