My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:18:25 AM
Creation date
9/30/2015 11:53:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (4)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6831
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> r 4 . Sad - 30 days. <br /> B . Should any of the plant materials show 40% or more defoliation during the <br /> guarantee period due to the Contractor's use of improper materials or workmanship <br /> the Contractor, upon written notice, shall replace same within 15 days, without <br /> additional cost to the Owner. <br /> C . Specifically excluded from. the guarantee are damages resulting from natural causes <br /> such as floods, lightning strikes, freezing or winds over 60 mph . , damages from <br /> acts of negligence on the part of the Owner or others occupying the site, fires, <br /> r vandalism and herbivorous animals . <br /> D . This guarantee shall be in effect only if proper maintenance is performed by the <br /> Owner, after final acceptance of the Contractor's work. Without such maintenance, <br /> this guarantee shall become null and void. Proper maintenance shall be considered <br /> as performing the procedures described generally in Section 3 ,03 . A <br /> MAINTENANCE (Items 2 & 3). <br /> 7 . SUBN=ALS <br /> rr A . Physical samples of prepared planting soil, and mulch. <br /> B . Labels from starter fer .ilimr. <br /> C . Submit recommendations for controller time setting for each irrigation zone valve to <br /> the Owner prior to completion of work. <br /> D . Submit recommended plant care and maintenance procedures to Owner prior to <br /> completion of work. <br /> E. Soil test results (see Part 3 , Section 1A). <br /> F . The Owner reserves the right to withhold 10% of the contract amount until the <br /> submittals are received. <br /> w <br /> PART 2 - PRODUCTS _ <br /> .. 1 . NIATERIALS <br /> A. NOMENCLATURE: Conform to the names given in Standardized Plant Names, <br /> 1942 Edition, prepared by the American Joint Committee on Horticultural <br /> Nomenclature. Names of varieties not included therein, conform generally with <br /> names accepted in the nursery trade. <br /> B . MEASUREMENTS : Plants shall be measured when branches are in their normal <br /> position. Height and spread dimensions specified refer to main body of plant and <br /> not extreme branch tip to tip. The measurements specified are the minimum size <br /> acceptable and are the measurements after pruning, where pruning is required, <br /> C . B & B PLANTS : No plant shall be accepted when the ball of earth surrounding its <br /> roots has been cracked or broken. The diameter of the ball must be sufficient to <br /> encompass the fibrous and feeding root system necessary for the maximum <br /> development of the plant. Root pruning shall have been done at a minimum of four <br /> wr <br /> (4) weeks before planting at the job. Anti-transpirant spray shall be applied <br /> 2A - 3 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.