Laserfiche WebLink
half (4 '/z) inches with a standard rotary mower. At no time shall more than 1/1. of <br /> the leaf surface be removed. <br /> 4. It will be the Owner' s responsibility to continue maintaining the landscape, <br /> following guidelines above, after final acceptance. <br /> B . GRADES : It shall be the responsibility of the. Contractor to finish (fine) . grade all <br /> landscape areas, eliminating all surface irregularities, depressions, sticks, stones, and <br /> other debris, and remove them from the site. Rough. grade shall be considered as site <br /> work (rather than landscaping) and shall be established to within ± 0 . 1 ' of design <br /> grade. Contractor is responsible for installation and contouring of all berms indicated <br /> on drawings . <br /> 4. CLEANING: The Contractor shall at all times keep the premises (grounds and <br /> • pavements) free from accumulations of waste material or rubbish caused by his <br /> employees or work. <br /> S . PAYMENTS : Shall be made .per "The Itemized Bid Schedule" in the Contract <br /> Documents and Specifications . <br /> r <br /> w <br /> r <br /> • <br /> Mr <br /> r <br /> • <br /> r <br /> 2A-6 <br />