Laserfiche WebLink
W <br />half (4'/z) inches with a standard rotary mower. At no time shall more than 1/1. of <br />the leaf surface be removed. <br />4. It will be the Owner's responsibility to continue maintaining the landscape, <br />following guidelines above, after final acceptance. <br />B. GRADES: It shall be the responsibility of the. Contractor to finish (fine). grade all <br />landscape areas, eliminating all surface irregularities, depressions, sticks, stones, and <br />other debris, and remove them from the site. Rough. grade shall be considered as site <br />work (rather than landscaping) and shall be established to within ± 0.1' of design <br />grade. Contractor is responsible for installation and contouring of all berms indicated <br />on drawings. <br />4. CLEANING: The Contractor shall at all times keep the premises (grounds and <br />• pavements) free from accumulations of waste material or rubbish caused by his <br />employees or work. <br />S. PAYMENTS: Shall be made _per "The Itemized Bid Schedule" in the Contract <br />Documents and Specifications. <br />M <br />W <br />M <br />r✓ <br />MW <br />so <br />• <br />[r: <br />2A-6 <br />W <br />