Laserfiche WebLink
r <br /> C.R. 512 <br /> IRRIGATION SYSTEM SPECIFICATIONS <br /> r <br /> PART I - GENERAL <br /> 1 . DESCRIPTION OF WORK <br /> A. Work included: This Section is part of the entire set of contract documents and <br /> shall be coordinated with the applicable provisions of the other parts. <br /> B . The extent of landscape irrigation system is shows on the drawings . Completion <br /> r of this work shall mean full and exact compliance and conformity with the <br /> provisions expressed or implied in the drawings, schedules and specifications. <br /> Irrigation installer is not relieved of his responsibility to provide proper irrigation <br /> r coverage by providing full and exact compliance with the drawings and <br /> specifications. If field conditions or other unforeseen factors warrant that design <br /> « modifications are necessary, irrigation installer shall notify Engineer immediately. <br /> C. The work under this section includes furnishing and installing materials to <br /> r construct an automatic irrigation system and maintaining that system until final <br /> completion and acceptance, but not less than 30 days from date of installation, and <br /> any other work as called for on the plans and in these specifications. <br /> r <br /> 2. RELATED WORK <br /> A. Electrical service to pump and controller shall be provided by others under <br /> separate contract with Owner, in compliance with N.E . C. requirements. <br /> r B. Site work (rough grading). <br /> C . Landscaping (see landscape specifications). <br /> r <br /> 3 . QUALITY ASSURANCE <br /> +� A. Landscape irrigation system installation shall only be performed by a firm that is <br /> regularly engaged full time in the installation of underground landscape irrigation <br /> systems . (Crews shall be controlled and directed by a foreman who is thoroughly <br /> familiar with the type of materials being installed and the manufacturer' s <br /> recommended methods of installation, and is well versed in reading blueprints.) <br /> B . Design modifications may be made only as necessary to meet field conditions and <br /> only as acceptable to Engineer. Piping shown on plans is diagrammatically routed <br /> for clarity — route to avoid conflict with specimen plants and adjust as necessary to <br /> r accommodate landscape construction. <br /> C . Contractor shall be responsible for verification at the site of all conditions and <br /> r dimensions shown on the plans prior to commencement of work. <br /> 2&-1 <br /> w. <br />