Laserfiche WebLink
.• D . CODES AND STANDARDS : Work shall comply with the American Society for <br /> Testing and Materials (ASTM) and National Electrical Code. <br /> E. REQUIREMENTS OF REGULATORY AGENCIES : Work shall comply with <br /> codes, ordinances , and regulations of all governing authorities. <br /> F . WATER TESTING: Contractor shall test the salt content (chlorides and t.d. $) of <br /> the irrigation well. <br /> 4. PRODUCT HANDLING: The Contractor shall protect all materials and work against <br /> injury from any cause and shall provide and maintain all necessary safeguards for the <br /> protection of the public. He shall be liable for any damage or injury to person or property <br /> which may occur as a result of his negligence in the prosecution of the work. <br /> 5 . JOB CONDITIONS <br /> A. EXISTING CONDITIONS <br /> 1 . Inspection: Contractor must examine the areas and conditions under which <br /> landscape irrigation system is to be installed and notify the Engineer in <br /> VW writing of conditions detrimental to the proper and timely completion of the <br /> work. Do not proceed with the work until unsatisfactory conditions have been <br /> ' corrected. Contractor shall fully acquaint himself with related planting, <br /> aw electrical, paving, site and utilities work to preclude any misunderstanding and <br /> to facilitate a trouble-free installation at the site. <br /> rr 2 . Should any objectionable materials such as old concrete, bricks or other debris <br /> be encountered during the installation operation, they shall be removed from <br /> the site by the Contractor. <br /> r <br /> B . SCHEDULING <br /> 1 . Crossing under paved areas as indicated, shall be installed by the Contractor. <br /> Crossings shall be installed prior to compaction or subgrade. <br /> • <br /> 2 . Irrigation installation shall not begin until rough grades have been established. <br /> 3 . Contractor shall be responsible for coordinating his work with all other parties <br /> involved with the job, and shall coordinate the supply of electrical power to <br /> the timing device (controller) . <br /> 4. Upon substantial completion of work, the Contractor shall request a walk- <br /> through by the Engineer to formulate a "punch list. " Contractor shall <br /> complete "punch list" items as quickly as possible, and request another walk- <br /> through to verify completion. Upon successful completion of the "punch list" <br /> w items, the work will be accepted by the Owner. <br /> 2B-2 <br /> r <br />