My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:18:25 AM
Creation date
9/30/2015 11:53:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (4)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6831
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br /> C . The Contractor is responsible for his own bathroom and drinking facilities . <br /> r <br /> 6 . UTILITIES <br /> A Prior to excavation, verify in the field the location and depth of all new and <br /> existing utilities and take proper precautions not to damage or disturb such <br /> utilities . <br /> r <br /> B . Repair to original condition, new and existing utilities and other work damaged <br /> r <br /> by Contractor' s construction. <br /> C. In the case of damages of the irrigation system caused by others, the cost of <br /> r repairing the work shall be paid by the party causing said damage. <br /> 7 . SUBMITTALS <br /> • <br /> A. After completion of piping installation, Contractor shall furnish the Owner' s <br /> representative a reproducible "as built" drawing showing all sprinkler heads, <br /> valves, and pipelines to reasonable scale, and provide a minimum of two <br /> dimensions taken from fixed obvious objects to each automatic control valve, and <br /> quick coupling valve. The Contractor shall also furnish a drawing showing a <br /> r, graphic representation of sprinkler zones . <br /> B . Instruction sheets and parts lists covering all operating equipment shall be bound <br /> r into a folder and furnished to the Owner' s representative in two (2) copies. The <br /> Owner reserves the right to withhold 10% of the contract amount until the "as <br /> built" drawings and instructions and parts lists folders are received. <br /> r <br /> C . Submit salt test results for irrigation well water. <br /> 4+ 8. GUARANTEE <br /> A. Guarantee workmanship for a period of one year aver date of fmai acceptance. in <br /> addition, see to the fulfillment of all manufacturer' s warranties. <br /> B . The Contractor shall provide the Owner with a written guarantee stating <br /> everything to be covered and any special conditions involved. <br /> PART 2 - PRODUCTS <br /> MATERIALS : Materials and equipment shall be new and shall operate at the manufacturer' s <br /> r published capacities . <br /> 1 . PIPE: Comply with the following unless otherwise indicated: All PVC pipe shall be 160 <br /> PSI, Polyvinyl Chloride (PVC 1120) ASTM-D2241 , Type 1 , NSF approved. <br /> 2 . CROSSINGS : Comply with the following: All crossings under paved areas for water <br /> and conduit lines shall be Schedule 40 PVC, ASTM-D1785 . <br /> 78-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.