Laserfiche WebLink
.. <br /> C . The Contractor is responsible for his own bathroom and drinking facilities . <br /> r <br /> 6 . UTILITIES <br /> A Prior to excavation, verify in the field the location and depth of all new and <br /> existing utilities and take proper precautions not to damage or disturb such <br /> utilities . <br /> r <br /> B . Repair to original condition, new and existing utilities and other work damaged <br /> r <br /> by Contractor' s construction. <br /> C. In the case of damages of the irrigation system caused by others, the cost of <br /> r repairing the work shall be paid by the party causing said damage. <br /> 7 . SUBMITTALS <br /> • <br /> A. After completion of piping installation, Contractor shall furnish the Owner' s <br /> representative a reproducible "as built" drawing showing all sprinkler heads, <br /> valves, and pipelines to reasonable scale, and provide a minimum of two <br /> dimensions taken from fixed obvious objects to each automatic control valve, and <br /> quick coupling valve. The Contractor shall also furnish a drawing showing a <br /> r, graphic representation of sprinkler zones . <br /> B . Instruction sheets and parts lists covering all operating equipment shall be bound <br /> r into a folder and furnished to the Owner' s representative in two (2) copies. The <br /> Owner reserves the right to withhold 10% of the contract amount until the "as <br /> built" drawings and instructions and parts lists folders are received. <br /> r <br /> C . Submit salt test results for irrigation well water. <br /> 4+ 8. GUARANTEE <br /> A. Guarantee workmanship for a period of one year aver date of fmai acceptance. in <br /> addition, see to the fulfillment of all manufacturer' s warranties. <br /> B . The Contractor shall provide the Owner with a written guarantee stating <br /> everything to be covered and any special conditions involved. <br /> PART 2 - PRODUCTS <br /> MATERIALS : Materials and equipment shall be new and shall operate at the manufacturer' s <br /> r published capacities . <br /> 1 . PIPE: Comply with the following unless otherwise indicated: All PVC pipe shall be 160 <br /> PSI, Polyvinyl Chloride (PVC 1120) ASTM-D2241 , Type 1 , NSF approved. <br /> 2 . CROSSINGS : Comply with the following: All crossings under paved areas for water <br /> and conduit lines shall be Schedule 40 PVC, ASTM-D1785 . <br /> 78-3 <br />