Laserfiche WebLink
r to lot or unit sales within the project served . by the system , or upon completion of <br /> construction of the system , whichever occurs first. For those systems which are proposed to <br /> be maintained by county or municipal entities, final operation and maintenance documents <br /> ,r must be received by the District when maintenance and operation of the system is accepted <br /> by the local governmental entity. Failure to submit the appropriate final documents <br /> referenced in this paragraph will result in .the permittee remaining liable for carrying out <br /> maintenance and operation of the permitted system. <br /> 8. Each phase or independent portion of the permitted system must be completed in <br /> accordance with the permitted plans and permit conditions prior to the initiation of the <br /> r permitted use of site infrastructure located within the area served by the portion or phase of <br /> the system . Each phase or independent portion of the system must be completed in <br /> accordance with the permitted plans and permit conditions prior to transfer of responsibility <br /> ` for operation and maintenance of that phase or portion of the system to local governmentor <br /> other responsible entity. <br /> 10. Within 30 days after completion of construction of the permitted system, or independent <br /> portion of the system, the permittee shall submit a written statement of completion and <br /> certification by a registered professional engineer or other appropriate individual as <br /> r authorized by law, utilizing As Built Certification Form 40C- 1 . 181 ( 13) or. 40C-1 . 181 ( 14) <br /> supplied with this permit. When the completed system differs substantially from the <br /> permitted plans, any substantial deviations shall be noted and explained and two copies of <br /> r as-built drawings submitted to the District. Submittal of the completed from shall serve to . <br /> notify the District that the system is ready for inspection . The statement of completion and <br /> certification shall be based on on-site observation of construction (conducted by the <br /> registered professional engineer, or other appropriate individual as authorized by law, or <br /> under his or her direct supervision) or review of as-built drawings for the purpose of <br /> determining if the work was completed in compliance with approved plans and <br /> specifications . As-built drawings shall be the permitted drawings revised -to reflect any <br /> changes made during construction. Both the original and any revised specifications must be <br /> clearly shown . The plans must be clearly labeled as "as-built" or "record" drawing . All <br /> surveyed dimensions and elevations shall be certified by a registered surveyor. The <br /> following information, at a minimum , shall be verified on the as-built drawings : <br /> 1 . Dimensions and elevations of all discharge structures including all weirs, slots, gates , <br /> r pumps , pipes , andoil and grease skimmers ; <br /> 2. Locations , dimensions, and elevations of all filter, exfiltration , or underdrain systems <br /> �. including cleanouts, pipes , connections to control structures , and points of discharge to the <br /> receiving waters; <br /> �. 3 . Dimensions , elevations , contours , or cross-sections of all treatment storage areas <br /> sufficient to determine state-storage relationships of the storage area and the permanent <br /> pool depth and volume below the control elevation for normally wet systems , when <br /> appropriate; <br /> 4. Dimensions , elevations , contours , final grades, or cross-sections of the system to <br /> w determine flow directions and conveyance of runoff to the treatment system ; <br /> 5 . Dimensions, elevations; contours , final grades, or cross-sections of all conveyance <br /> systems utilized to convey off-site runoff around the system; <br /> M. <br /> 6 . Existing water elevation(s ) and the date determined; and Elevation and location of <br /> benchmark(s) for the survey. <br /> r <br />