My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:18:25 AM
Creation date
9/30/2015 11:53:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (4)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6831
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 . The operation phase of this permit shall not become effective until thepermittee -has <br /> complied with the requirements of general condition 9 above, the District determines the <br /> system to be in compliance with the permitted plans , and the entity approved by the District <br /> in accordance with subsections 7 . 1 . 1 through 7. 1 .4 of the Applicant's Handbook: <br /> Management and Storage of Surface Waters, accepts responsibility for operation and <br /> maintenance of the system . The permit may not be transferred to such an approved r <br /> operation and maintenance entity until the operation phase of the permit becomes effective. <br /> . Following inspection and approval of the permitted system by the District, the permittee shall <br /> request transfer of the permit to the responsible approved operation and maintenance entity, <br /> if different from the permittee. Until the permit is transferred pursuant to section 7 . 1 of the <br /> Applicant's Handbook: Management and Storage of Surface Waters , the permittee shall be <br /> liable for compliance with the terms of the permit. , <br /> 12 . Should any other regulatory agency require changes to the permitted system, the permittee <br /> shall provide written notification to the District of the changes prior implementation so that a <br /> determination can be made whether a permit modification is required . <br /> 13 . This permit does not eliminate the necessity to obtain any required federal , state, local and <br /> special district authorizations prior to the start of any activity approved by this permit. This <br /> permit does not convey to the permittee or create in the permittee any property right, or any <br /> interest in real property, nor does it authorize any entrance upon or activities on property <br /> which is not owned or controlled by the permittee , or convey any rights or privileges other <br /> than those specified in the permit and . chapter 40C-4 or chapter 400-40 , F.A.C. <br /> 14. The permittee shall hold and save the District harmless from any and all damages , claims , <br /> or liabilities which may arise by reason of the activities authorized by the permit or any use <br /> of the permitted system. <br /> 15 . Any delineation of the extent of a wetland or other surface water submitted as part of the <br /> permit application , including plans or other supporting documentation , shall not be <br /> considered specifically approved unless a specific unless a specific condition of this permit <br /> or a. formal determination under rule 40C-1 . 1006, F .A.C. . , provides otherwise . <br /> 16 . The permittee shall notify the District in writing within 30 days of any sale, conveyance , or <br /> other transfer of ownership or control of the permitted system or the real property at which <br /> the. permitted system is located . All transfers of ownership or transfers of a .permit are <br /> subject to the requirements of rule 4DC- 1 . 612 , F.A. C. The permittee transferring the permit <br /> shall remain liable for any corrective actions that may be required as a result. of any permit <br /> violations prior to such sale , conveyance or other transfer. <br /> 17 . Upon reasonable notice to the permittee , District authorized, staff with proper identification <br /> shall have permission to enter, inspect, sample and test the system to insure conformity with <br /> the plans and specifications approved by the permit. <br /> 18 : The permittee shall immediately notify the District in writing of any previously submitted <br /> information that is later discovered to be inaccurate . <br /> 19 . This permit for construction will expire five years from the date of issuance. <br /> 20 . At a minimum , all retention and detention storage areas must be excavated to rough grade <br /> prior to building construction or placement of impervious surface within the area to be <br /> served by those facilities . To prevent reduction in storage volume and percolation rates, all <br /> accumulated sediment must be removed from the storage area prior to final grading and <br /> stabilization . <br />
The URL can be used to link to this page
Your browser does not support the video tag.